The Nueces County Road 47 Bridge Widening (ARPA) project involves the widening of County Road 47 at the existing box culvert crossing between South Prairie Road and Rabbit Run. The project includes partial demolition of the existing concrete boxes, installation of steel reinforcing, and extension of the boxes. The contractor will also provide temporary storm water drainage and reconstruct the existing roadway. The project must be completed within 120 calendar days after the date of the Notice to Proceed for the Base Bid. Key aspects of the project include:
• Widening of County Road 47 at the existing box culvert crossing
• Partial demolition of the existing concrete boxes
• Installation of steel reinforcing and extension of the boxes
• Provision of temporary storm water drainage
• Reconstruction of the existing roadway
• Completion of the project within 120 calendar days after the date of the Notice to Proceed for the Base Bid