This contract awards the design, supply, installation, testing, and commissioning of a complete ventilation system for the Rock Bridge High School Scene Shop. Harold G. Butzer Inc. won the award with a total value of $151,928, which includes the base HVAC system and three optional alternates: a new concrete drive‑way, electric reels for stage lighting/rigging, and a stainless‑steel exterior finish. Two firms submitted bids, but the award went to the lower‑priced vendor. The project is a classic mechanical/HVAC job with additional civil, electrical, and metal‑finishing elements, making it relevant for integrated MEP contractors or firms that can handle multi‑disciplinary school‑facility upgrades.
• Base HVAC ventilation system for a high‑school scene shop (core mechanical work).
• Alternates expand scope to concrete work, stage‑lighting electrical reels, and stainless‑steel exterior finish.
• Awarded to Harold G. Butzer Inc. for $151,928, beating the competing bid of $162,880.