This contract is for the repair of the Three Creek Pathway in Teton County, Wyoming. The project involves the removal and replacement of the existing 10-foot wide paved multi-use pathway, trenching and backfilling for the installation of a root barrier product, and other miscellaneous items. The contract was awarded to Westwood Curtis Construction, Inc. for a total bid price of $437,830.00. The project is expected to start on June 29, 2021, and be completed by November 15, 2021.
• The project includes unclassified excavation above subgrade, reconstruction of the pathway, installation of a root barrier product, topsoil placement, and seeding.
• The contract requires the contractor to perform all extra work that may be required, subject to the provisions set forth in the Project Manual.
• The contractor must commence work in accordance with the Notice to Proceed and complete the project by the specified dates.
• The contract includes a certification of non-discrimination, non-collusion, and suspension or debarment.