The project involves installing humidification monitoring and control systems for a pharmacy cache. The work includes furnishing, installation, connection, and testing of electrical conductors and cables for use in electrical systems rated 600 V and below. The contractor must ensure that the installation meets the requirements of the National Electrical Code (NEC) and other applicable standards. The project also involves splicing and terminating conductors, installing control wiring, and performing acceptance checks and tests.
• The contractor must provide shop drawings and submit certifications from the manufacturer and the contractor.
• The contractor must ensure that the conductors and cables meet the specified requirements, including insulation type and color coding.
• The contractor must install cable supports and provide split wedge type clamps for vertical feeders.
• The contractor must perform visual inspections and electrical tests, including phase rotation tests and insulation resistance tests.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.