Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Civil Engineering
  5. ›GPP Rain Garden / Bioretention Project

Michigan City of Grosse Pointe Park·Michigan

GPP Rain Garden / Bioretention Project

Closes 12/17/2025$50k – $100kRequest for QuotationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Grosse Pointe Park is seeking design and engineering services for a green stormwater infrastructure project at the entrance to City Hall. The project involves constructing a bioretention area to mitigate stormwater runoff and ice buildup, which creates a safety hazard for pedestrians. The selected firm will be responsible for developing a final design and construction drawings, as well as providing consultation and review services during the construction phase. Key aspects of the project include: • Reviewing the SEMCOG Concept Design and developing a final design that meets the EPA grant requirements • Conducting site surveys and verifying utility locations • Creating construction drawings and technical specifications • Providing cost estimates and construction documents • Attending meetings with city staff, contractors, and SEMCOG consultants • Conducting site visits and providing field reports The project is funded by an EPA grant, and the selected firm must comply with all grant requirements and regulations.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Cindy Paparelli(Assistant City Manager)

[email protected]

(313) 822-6200 x273

Key dates

Opened
11/18/2025
Closes
12/17/2025

Last updated

Details

Type
Request for Quotation
Industry
Civil Engineering
NAICS
541310
Solicitation №
FY25-5

Budget estimate

$50,000 – $100,000

Based on the EPA grant award of $60,335, the budget for this project is likely to be in the range of $50,000 to $100,000, considering the scope of work and the services required. However, the actual budget may vary depending on the final design and construction costs. Factors that may influence the budget include the complexity of the design, the materials and labor required, and any potential changes or modifications to the project scope.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

New York State Department of Environmental Protection·New York

Top match · 69%

82627P0002-BEPA: GI-PSE 1-3 Design Services Task Order Contract for Green Infrastructure in NYC Parks & City-owned Street Ends

Closes 11/18/2026Opened 10/21/2026

California Grants·California

66% match

Baldwin Hills & Urban Watersheds Conservancy (BH UWC) Proposition 4: Community and Climate Resilience Grant Program

Rolling / TBD closeOpened 5/6/2026

El Paso Water·Texas

66% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

City of Newark·New Jersey

66% match

Green Parks Projects: NJ Regional Day School, Bo Porter Sports Complex, Mildred Helms Park, and Homestead Park

Closes 11/19/2026Opened 9/16/2025

El Paso Water·Texas

66% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

U.S. Department Of The Interior·Colorado

65% match

Y--GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ

Closes 11/2/2026Opened 6/26/2025

El Paso Water·Texas

65% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 12/2/2026Opened 9/20/2026

U.S. Department Of The Interior·Arizona

65% match

Y--GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ

Closes 11/2/2026Opened 7/20/2026

El Paso Water·Texas

65% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

California Department of Transportation·California

65% match

Construct GSRD, DPPIA and install irrigation system.

Closes 12/8/2026Opened 10/19/2026

New York State Energy Research and Development Authority·New York

65% match

Sun and Soil Program

Closes 12/10/2026Opened 9/16/2026

City of Cape Canaveral·Florida

65% match

Stormwater Pilot Project

Closes 11/12/2026Opened 10/15/2026

Town of Babylon·New York

65% match

BID# 26G49 - CONSTRUCTION OF BIOSWALE AT GEGIER PARK

Closes 11/19/2026Opened 10/30/2026

California Department of Transportation·California

65% match

Construct DPP infiltration areas, capture housing, bioswales, & MVPs.

Closes 11/10/2026Opened 9/28/2026

City of Anderson·South Carolina

64% match

Generostee Creek WWTP & Rocky River WWTP Geomembrane Liner Replacement

Closes 11/4/2026Opened 10/6/2026

Office of the State Engineer·New Mexico

64% match

Precipitation Enhancement Program – Part 2: Applied Demonstration and Operational Projects

Closes 11/10/2026Opened 10/14/2026

City of Philadelphia·Pennsylvania

64% match

ROADWAY PLANTERS PROGRAM REQUEST/OTIS

Closes 11/10/2026Opened 10/9/2026

City of Salisbury·Maryland

64% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

Washington Suburban Sanitary Commission, MD·Maryland

64% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

City of Harrisonburg·Virginia

64% match

Water Treatment Plant Sedimentation Basin Plate Settlers Project RFP (2027004-PU-DB)

Closes 12/10/2026Opened 10/6/2026

California Grants·California

64% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

California Grants·California

64% match

Greenhouse Gas Reduction Loan Program

Rolling / TBD closeOpened 4/16/2024

Alcorn State University·Mississippi

64% match

Hydroponic Plant Growth System

Closes 11/5/2026Opened 10/9/2026

City of Douglas·Wyoming

64% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Massachusetts Department of Environmental Protection·Massachusetts

64% match

DEP-BWR-NOI-FY27-LIS Nitrogen Reduction Grantt ANNOUNCEMENT ONLY

Closes 12/21/2026Opened 9/3/2026