Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Water and Wastewater
  5. ›SPRINGTREE WTP IMPROVEMENTS PHASE 2 - NANOFILTRATION…

Town of Groton·Connecticut

SPRINGTREE WTP IMPROVEMENTS PHASE 2 - NANOFILTRATION TREATMENT EXPANSION, BID 26-51-03-CM

Closes 8/17/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Work consists of, but not limited to, the installation of a second membrane treatment unit with a capacity of 1.7-mgd to the existing reverse osmosis (RO) treatment system at Springtree Water Treatment Plant (WTP). The RO system will include a new connection to the existing raw water main, a third Biscayne Aquifer raw water feed pump (new feed pump shall match the existing manufacturer and model of the existing pumps), modular skid mounted equipment, one sand strainer, two cartridge filters, one degasifier, one sodium hydroxide tank, and one sulfuric acid tank. Systems including electrical and instrumentation and controls components are included in this project. All work is to be constructed in accordance with the Drawings and Specifications.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
6/10/2026
Closes
8/17/2026

Last updated

Details

Industry
Water Management and Sanitation
NAICS
221310

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Douglas·Wyoming

Top match · 70%

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Douglas·Wyoming

69% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Braintree·Massachusetts

69% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

City of Temple Terrace, FL·Florida

69% match

Professional Engineering Services for PFAS Compliance Nanofiltration Treatment, and Concentrate Management

Closes 11/16/2026Opened 10/6/2026

Georgia City of Peachtree City·Georgia

68% match

Tuxedo Lane Drainage Improvement Project (10/19 amended)

Closes 11/17/2026Opened 10/15/2026

North Carolina Orange Water and Sewer Authority·North Carolina

68% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/27/2026

City of Bakersfield·California

68% match

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

Western Virginia Water Authority·Virginia

68% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Jackson County Utility Authority·Mississippi

68% match

WJC Process Improvements Phase 1

Closes 12/8/2026Opened 8/16/2026

Cape Fear Public Utility Authority·North Carolina

68% match

BID RESULTS - Wrightsboro Elevated Water Tank Rehabilitation

Closes 11/27/2026Opened 9/23/2026

North Carolina Orange Water and Sewer Authority·North Carolina

68% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/26/2026

City of Eureka Springs·Arkansas

68% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

City of Whitehall·Ohio

68% match

Beechbank and Broadhurst Sewer Rehabilitation

Closes 11/13/2026Opened 10/28/2026

Western Virginia Water Authority·Virginia

68% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Town of Upton·Wyoming

68% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

County of Frederick, MD·Maryland

67% match

Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/9/2026

City of Appleton·Wisconsin

67% match

WTP BOILER REPLACEMENT

Closes 12/2/2026Opened 10/23/2026

City of Peachtree City·Georgia

67% match

Tuxedo Lane Drainage Improvements (amended)

Closes 11/17/2026Opened 10/15/2026