Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Engineering Services
  5. ›Airport Architectural/Engineering Services for Airport…

Nevada Government·Nevada

Airport Architectural/Engineering Services for Airport Development Projects

Closes 10/13/2026$5M – $20MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Boulder City, Nevada is issuing a Statement of Qualifications (SOQ) to select a single qualified architectural/engineering consulting firm to provide comprehensive services for a suite of airport development projects, many of which are contingent on Federal Airport Improvement Program (AIP) funding. The scope covers everything from preliminary planning, design, and grant administration through construction‑phase inspection and close‑out, including runway and taxiway rehabilitation, apron extensions, lighting upgrades, environmental studies, safety improvements, and related equipment procurement. The selected firm will act as the City’s primary airport consultant, coordinating with the FAA, preparing grant applications, conducting surveys, and providing on‑site construction management. • Services span four phases: Preliminary, Design, Bidding/Negotiation, and Construction support. • Projects include runway 09/27 reconstruction, taxiway Delta redesign, apron extensions, lighting/ signage upgrades, pollution control facilities, ARFF station, perimeter fencing, and various safety and environmental studies. • Firm must be licensed in Nevada, able to handle federal grant administration, and possess experience with FAA regulations and airport‑specific engineering. • Submission is a single PDF (≤50 pages) via Nevada Government eMarketplace by 2:00 PM PT, 13 Oct 2026; questions due by 12:00 PM PT, 22 Sep 2026. • Evaluation criteria emphasize team qualifications, relevant airport engineering experience, capability to perform the full project suite, and familiarity with FAA processes.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Paul Sikora

[email protected]

(702) 293-9246

Key dates

Opened
9/3/2026
Questions due
9/22/2026
Closes
10/13/2026

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330
Solicitation №
2026-12

Budget estimate

$5,000,000 – $20,000,000

The solicitation does not disclose a contract ceiling, but the listed scope includes multiple major runway, taxiway, apron, lighting, and safety system projects that typically run into the multi‑million‑dollar range for a small regional airport. Assuming an average design‑build cost of $3–5 million per major runway/taxiway rehabilitation and additional $1–2 million for ancillary works (lighting, fencing, environmental studies, equipment procurement), the total consulting fee could reasonably fall between $5 million and $20 million over the life of the program. The lower bound reflects a limited number of projects being funded; the upper bound assumes most listed items receive AIP funding and require full‑service engineering support.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lawrence·Kansas

Top match · 82%

On-Call Engineering, Architecture and Construction Services for Airport Development

Closes 11/10/2026Opened 10/19/2026

Louisa County·Virginia

79% match

Aviation Engineering, Planning & Consulting Services LKU-27-03

Closes 11/3/2026Opened 9/29/2026

Georgia Bulloch County Board of Commissioners·Georgia

76% match

Airport Consulting Services - Engineering

Closes 12/3/2026Opened 10/29/2026

City of Lawrence·Kansas

76% match

On-Call Planning Consulting Services for Airport Development

Closes 11/24/2026Opened 10/19/2026

State Technical College of Missouri·Missouri

76% match

1H3 Airport Notice-to-Airport-Consultants

Closes 11/13/2026Opened 10/28/2026

Sanford Airport Authority·Florida

76% match

Airport Digital Twin Platform Implementation and Support Services

Closes 11/23/2026Opened 10/22/2026

Town of Payson·Arizona

76% match

Payson Municipal Airport Facility Development FY27

Closes 11/30/2026Opened 9/18/2026

City of Torrance·California

76% match

Engineering Design Services for the Torrance Airport Zamperini Field Runway 11L-29R, I-126

Closes 11/20/2026Opened 10/23/2026

Bill and Hillary Clinton National Airport·Arkansas

75% match

Municipal Advisory Services

Closes 12/2/2026Opened 10/31/2026

City of Keene·New Hampshire

75% match

5-Year Airport Consulting Services

Closes 11/10/2026Opened 10/9/2026

Bill and Hillary Clinton National Airport·Arkansas

75% match

Airport Service Development Consultant

Closes 12/2/2026Opened 10/31/2026

Sedgwick County·Kansas

75% match

Architectural and Engineering Services for Joint Sedgwick County Sheriff's Office / Kansas Highway Patrol Hangar

Closes 12/1/2026Opened 10/14/2026

City of Keene·New Hampshire

74% match

5-Year Airport Consulting Services

Closes 11/10/2026Opened 10/9/2026

Grand County·Colorado

74% match

Airport Engineering Services

Rolling / TBD closeOpened 4/20/2026

NYS Niagara Frontier Transportation Authority·New York

74% match

NFIA – Runway 10-28 Rehabilitation (Designs)

Closes 11/3/2026Opened 10/2/2026

City of Phoenix·Arizona

74% match

Airport Technology Consulting Services

Closes 12/3/2026Opened 10/13/2026

Franklin County Board of County Commissioners·Florida

72% match

ITB- AIRPORT WEST HANGER DEVELOPMENT

Closes 12/14/2026Opened 10/28/2026

City of Prescott·Arizona

72% match

PRC Airport Hangar Development Phase 1

Closes 12/10/2026Opened 10/30/2026

City of Albany·Georgia

72% match

Airport Marketing Plan

Closes 11/10/2026Opened 10/7/2026

San Joaquin County·California

71% match

Stockton Metropolitan Airport (SCK) Access Control System Assessment, Upgrade, Consulting, and Maintenance

Closes 12/18/2026Opened 10/30/2026

City of Charlotte·North Carolina

71% match

Airport Traffic and Curb Support Services

Rolling / TBD closeOpened 5/15/2026

City of Charlotte·North Carolina

71% match

Runway 18/36 and Taxiway Delta Rehab Construction

Rolling / TBD closeOpened 12/14/2026

Port of Portland·Oregon

71% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

City of Charlotte·North Carolina

71% match

Airport Surveillance Radar Relocation Construction

Rolling / TBD closeOpened 5/3/2027

U.S. Department Of Transportation·Florida

71% match

MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale- Hollywood International Airport

Closes 11/5/2026Opened 10/29/2026