This sealed‑bid competitive procurement seeks a qualified contractor to fully reconstruct Runway 6‑24 at Plymouth Municipal Airport and to reconstruct Taxiways H, J, K, L. The work includes demolition of existing pavement, sub‑grade preparation, installation of new asphalt binder and wearing courses, full runway‑edge and taxiway‑edge LED lighting, relocation and installation of guidance signage, installation of underground 5 kV power cable and associated conduit/duct banks, pavement marking removal and new permanent markings, erosion‑control measures, and all required testing and documentation. The contract also requires a 5 % bid bond, 100 % performance and payment bonds, compliance with DBE requirements (49 CFR Part 23), and adherence to Massachusetts wage rules. Bidders must download the full set of specifications and drawings, attend an optional pre‑bid conference, and submit a sealed hard‑copy bid by the deadline. The runway portion is scheduled for a 7‑day closure; other taxiway closures are phased but dates are not fixed.
• Complete demolition, sub‑grade work, and new asphalt pavement for ~4,350 LF × 75 ft runway and associated taxiways.
• Install new in‑pavement LED runway edge lights (L‑850) and LED taxiway edge lights (L‑861T), plus guidance signs and runway‑closure markers.
• Provide underground 5 kV power cable (L‑108) with concrete‑encased duct banks, counter‑poise wire, and full testing per FAA standards.
• Deliver erosion‑control, site restoration, and a 12‑month warranty on all materials and workmanship.