The City of West Des Moines is seeking a qualified Construction Manager‑at‑Risk (CMaR) to provide pre‑construction and construction management services for the demolition, site work, and construction of a new 16,600 sf Fire & EMS Station 21 (plus a 2,250 sf mezzanine). The CMaR will develop a Guaranteed Maximum Price (GMP), coordinate design‑build activities, manage subcontractor bids, and oversee construction through commissioning, with an anticipated construction period from June 2027 to October 2028 and a total project budget of approximately $12.7 million.
• Scope includes demolition of existing station (excluding telecom tower & generator), site grading, utilities, pavement, landscaping, and construction of a concrete‑masonry main building with steel‑framed roof.
• Required services: pre‑construction constructability reviews, cost estimating, value engineering, bid package development, GMP negotiation, construction‑phase scheduling, safety program, quality control, and warranty‑period oversight.
• Minimum qualifications: 80 point scoring threshold, demonstrated experience on similar public‑safety facilities, solid safety record, ability to obtain required insurance and bonds, and submission of non‑collusion affidavit.
• Key dates: Pre‑bid conference 9/14/2026 (non‑mandatory), questions due 9/18/2026, SOQ deadline 9/30/2026, RFP issuance 10/13/2026, proposal deadline 10/21/2026, contract award 11/16/2026.
• Deliverables: Detailed cost estimates at design milestones, GMP agreement, construction schedule, and final close‑out documentation.
• Evaluation based on relevant project experience, past performance, safety record, proposed personnel, and methodology.