Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Civil Engineering
  5. ›SECTION 10 WATER RECLAMATION PLANT (WRP) CLARIFIER 3 AND…

City of Bullhead City·Arizona

SECTION 10 WATER RECLAMATION PLANT (WRP) CLARIFIER 3 AND RETURN ACTIVATED SLUDGE / WASTE ACTIVATED SLUDGE (RAS/WAS) PUMP STATION IMPROVEMENTS

Closes 1/14/2026$1M – $5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Bullhead City is seeking bids for the construction of a third clarifier and associated yard piping, addition of a new RAS/WAS pump, and replacement of two existing RAS/WAS pumps at the Section 10 Water Reclamation Plant. The project includes excavation, concrete work, site grading, and SCADA upgrades. The contractor will be responsible for providing all labor, materials, and equipment necessary to complete the project. • The project requires the construction of a new clarifier splitter box and the demolition of the existing splitter box. • The contractor must upsize existing secondary effluent piping and add a secondary effluent manhole. • The project includes the rehabilitation of two existing clarifiers, including cleaning, concrete repair, and coating. • The contractor must provide temporary facilities, including office space, storage, and toilet facilities. • The project requires coordination with utility companies and other trades to ensure efficient and effective execution of the work.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jackie Renfroe(Administrative Analyst)

[email protected]

(928) 763-9400, ext. 8840

Key dates

Opened
12/10/2025
Questions due
12/23/2025
Pre-bid meeting
12/18/2025
Closes
1/14/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
26-U-004

Budget estimate

$1,000,000 – $5,000,000

Based on the project description, the budget for this opportunity is estimated to be between $1,000,000 and $5,000,000. This estimate is based on the scope of work, which includes the construction of a third clarifier, addition of a new RAS/WAS pump, and replacement of two existing RAS/WAS pumps, as well as excavation, concrete work, and SCADA upgrades. The estimate also takes into account the project duration of 180 days and the requirement for the contractor to provide all labor, materials, and equipment necessary to complete the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Upper Occoquan Service Authority·Virginia

Top match · 74%

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

Renewable Water Resources·South Carolina

71% match

Lime Slurry Supply at Water Resource Recovery Facilities (WRRFs) and Pump Stations RFP 607

Closes 12/4/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

69% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

New York City Department of Environmental Protection·New York

69% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

New York City Department of Environmental Protection·New York

69% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of Bakersfield·California

69% match

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

Oregon Clackamas County·Oregon

69% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026

City of Charlotte·North Carolina

69% match

Reclaimed Water Pumping Capacity Improvements at Mallard

Rolling / TBD closeOpened 1/31/2026

City of Charlotte·North Carolina

68% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of San Clemente·California

68% match

WRP Grit Classifier Replacement Project

Closes 11/19/2026Opened 10/22/2026

Saline County Waterworks and Sanitary Sewer Public Facilities Board·Arkansas

68% match

Saline County Waterworks & Sanitary Sewer Public Facilities Board – WWTP Improvements

Closes 11/12/2026Opened 10/18/2026

Town of Jupiter·Florida

68% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

Dickenson County·Virginia

68% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Manatee County - Purchasing Division·Florida

68% match

SEWRF 3rd Sludge Holding Tank

Closes 11/16/2026Opened 9/9/2026

City of Montpelier·Vermont

68% match

Wastewater Collection System – Suction Lift Pump Station Equipment Preselection

Closes 12/3/2026Opened 10/28/2026

Alaska Department of Environmental Conservation – Village Safe Water Program·Alaska

68% match

Notice of Categorical Exclusion Determination - Marshall Phase 9 Water and Sewer Improvements

Rolling / TBD closeOpened 9/25/2026

California Grants·California

68% match

Proposition 4 – Water Recycling

Closes 6/30/2030Opened 7/6/2026

City of Hollywood·Florida

68% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Citrus County - Board of County Commissioners·Florida

68% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

City of Douglas·Wyoming

68% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Key West·Florida

68% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

Maryland Department of Public Works·Maryland

68% match

WWTP Sludge Pad Replacement

Closes 11/5/2026Opened 9/29/2026

Gwinnett County Government·Georgia

68% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of Grand Pass·Oregon

67% match

Water Treatment Plant Solids Hauling FY24-26

Closes 12/31/2026Opened 3/1/2023

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026