The United States Coast Guard Surface Force Logistics Center has a requirement for technical and engineering support to mock up and test an upgraded throttle control system for the Isotta Frashchini V1312-MLH-KC Main Diesel Engines used by the WLR/WLIC Fleet. The contractor shall provide services related to providing technical and engineering support in mocking up and testing the upgraded TC3 throttle control system. The scope of work includes assembling the throttle control to a shop engine and reduction gear for testing, connecting the LOP to the engine junction box, and verifying that all gauges are working correctly. The contractor shall also adjust the Heinzman controller with a laptop to ensure alignment with the new controller, line up the fuel and cooling systems, start and operate the engine, and test the local speed control from the LOP and remote stations.
• Assemble throttle control to shop engine and reduction gear for testing
• Connect LOP to engine junction box, power on LOP, and verify all gauges are working correctly
• Adjust Heinzman controller with lap top to ensure alignment with new controller
• Line up fuel system
• Line up cooling system
• Start and operate engine
• Test Local speed control from LOP and Remote stations
• Test Speed Control from both main and back up stations
• Proceed testing for reverse control sequence
• Make final adjustments as needed to throttle control program to ensure proper operations
• Upon satisfactory test, disconnect new throttle control and harness from test engine and reduction gear
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.