Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›CUNY Hunter College North, West, and East Building…

Dormitory Authority of the State of New York·New York

CUNY Hunter College North, West, and East Building Elevator Modernization and Associated Asbestos and HAZMAT Abatement

Closes 5/12/2026$30M – $35MRequest for QualificationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY See the Eligibility Requirements further down in this document. Hunter North, West and East buildings require new elevators systems to current code. The scope of work will include replacing aging systems to enhance safety, performance, energy efficiency, and code compliance also including all associated work in the North, West and East buildings. Estimated Cost Range: $30,000,000 to $35,000,000. Project Labor Agreement The successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the Form of Bid. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO. Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice. Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid. Please find links to the specifications and drawings below: Hunter East Building Spec Book Hunter North Building Spec Book Hunter West Building Spec Book Hunter East Building Drawings Hunter North Building Drawings Hunter West Building Drawings General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents. The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows: Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45% Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18% Women's Business Enterprise Goal 12% Service-Disabled Veteran Owned Businesses 6% Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid. Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to [email protected]. Instructions for Submission of the EOI Packages: Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection. Each package shall be submitted with: 1. A Cover Page that clearly identifies: · The Legal Name of the Company submitting the EOI · The Project Name for which the EOI is being submitted · The Date of Submission 2. Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number. 3. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation. 4. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation. Tabs must be in the following sequence: Tab 1 – Company Profile Provide a company profile that includes the following information: · Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project. · Date Established – When the company was founded. · Company Address – Primary business location. · Ownership Information – Name and resumes of all principal owners. · Client List – Summary of public and private sector clients. · Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers. · Equipment - Overview of all equipment owned by the company. · Self-Performed Services - Description of all services the company performs directly (not subcontracted). · MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certifications (if applicable). Tab 2 – Experience Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed. Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information: · Name of the project designer · Firm name and contact information · Project title and location/facility · Brief description of the project · Total construction cost · Construction start date · Substantial completion date · Indicate role as prime contractor or subcontractor · Percentage of the work that was self-performed If applicable, also include a list of all DASNY projects completed within the last 5 years. Tab 3 – Project Schedules Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project. Tab 4 – Safety Program Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety. Tab 5 – Résumés Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative. Tab 6 – Potential Subcontractors Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work. Tab 7 – Anticipated Workload Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe. Tab 8 – Experience Modification Rating Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation. Tab 9 – Bonding Capacity Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements. Tab 10 – NYS Vendor Responsibility Questionnaire Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy. Eligibility/Qualifications Requirements/Preferences: Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY. Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and [email protected]. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Caroline Kelly-O'Neill(Project Manager)

[email protected]

(518) 948-6239

Key dates

Opened
4/14/2026
Closes
5/12/2026

Last updated

Details

Type
Request for Qualification
Industry
Construction
NAICS
236220
Solicitation №
2133920

Budget estimate

$30,000,000 – $35,000,000

The estimated budget for this project is between $30,000,000 and $35,000,000. This estimate is based on the project's scope, which includes the modernization of elevators and associated asbestos and HAZMAT abatement in three buildings. The actual budget may vary depending on various factors, including the complexity of the work, the materials and labor required, and the contractor's expertise and efficiency.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

CUNY Baruch College·New York

Top match · 77%

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

Department of Administration·South Carolina

73% match

Mills/Jarrett Building - Elevator Modernization

Closes 11/17/2026Opened 10/19/2026

Dormitory Authority of the State of New York·New York

73% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/5/2026Opened 9/24/2026

Dormitory Authority of the State of New York·New York

73% match

CUNY Baruch College Information & Technology Building 2nd, 3rd, & 4th Floor Library Renovation & Associated Asbestos Abatement

Closes 11/4/2026Opened 9/25/2026

Dormitory Authority of the State of New York·New York

73% match

CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and Asbestos Abatement (Small Business Concerns and Minority Business Concerns only)

Closes 12/16/2026Opened 10/30/2026

State University of New York (SUNY)·New York

72% match

College in the Woods Elevator Replacement-General Construction

Closes 11/6/2026Opened 10/16/2026

State University of New York (SUNY)·New York

71% match

College in the Woods Elevator Replacement-Electrical

Closes 11/9/2026Opened 10/19/2026

Dormitory Authority of the State of New York·New York

71% match

CUNY Hunter College - Furnish and Delivery of AV Equipment

Closes 11/4/2026Opened 9/23/2026

Dormitory Authority of the State of New York·New York

70% match

CUNY Queens College Hot Water Storage Tank Replacement and Asbestos Abatement

Closes 11/17/2026Opened 10/9/2026

San Gabriel Unified School District·California

70% match

2026-Bid-SG-04_Addendum One_Mobilization Exhibit_Gabrielino HS HVAC Replacement

Rolling / TBD closeOpened 5/6/2026

New York State Thruway Authority - Procurement Services·New York

70% match

Elevator Maintenance on the Governor Mario M. Cuomo Bridge for NY Division

Closes 11/30/2026Opened 9/25/2026

Dormitory Authority of the State of New York·New York

70% match

CUNY York College Exterior Light & Perimeter Fence & Asbestos Abatement (Minority and Women-Owned Business Concerns only)

Closes 11/19/2026Opened 10/14/2026

Town of Arlington·Massachusetts

70% match

Oil Hydraulic Elevator Improvements - Thompson Elementary School

Closes 11/3/2026Opened 9/17/2026

Montana State University·Montana

69% match

Hamilton Hall - Life Safety Improvements

Closes 11/18/2026Opened 10/30/2026

State University of New York (SUNY)·New York

69% match

Project Number 351039 - Modernize Elevator in Harder Hall

Closes 11/20/2026Opened 10/13/2026

University of South Carolina·South Carolina

69% match

ELEVATOR MAINTENANCE UPSTATE

Closes 11/12/2026Opened 9/5/2026

NYS Titan Roofing, Inc.·New York

69% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 10/7/2026

Technical College System of Georgia·Georgia

69% match

82000-RYDC Building Abatement

Closes 11/20/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

69% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Iowa City·Iowa

69% match

City Hall ADA Elevator Modernization Project

Closes 11/19/2026Opened 10/7/2026

University of South Carolina·South Carolina

69% match

ELEVATOR MAINTENANCE AND REPAIR USC UPSTATE

Closes 11/12/2026Opened 10/6/2026

City University of New York·New York

69% match

College of Staten Island-Campus-Wide Flood Mitigation

Closes 12/18/2026Opened 9/25/2026

NYS Boilermatic Welding Industries, Inc.·New York

69% match

CUNY BARUCH COLLEGE SOUTH CAMPUS BOILERS &ASBESTOS ABATEMENT

Closes 11/3/2026Opened 10/7/2026

Dormitory Authority of the State of New York·New York

69% match

CUNY York College Exterior Light & Perimeter Fence & Asbestos Abatement (Minority and Women-Owned Business Concerns only)

Closes 11/19/2026Opened 10/14/2026

Mississippi Department of Health·Mississippi

69% match

Elevator Maintenance

Closes 11/20/2026Opened 10/19/2026