Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›CIP 2295-19 Measure K-14 Street Rehabilitation & Repair…

City of Grover Beach·California

CIP 2295-19 Measure K-14 Street Rehabilitation & Repair Project

Closes 9/3/2026$2.8M – $3.5MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Grover Beach is soliciting sealed bids for the complete rehabilitation and repair of approximately 28 blocks of K‑14 Street (Measure K‑14). The scope includes full pavement removal and hot‑mix asphalt resurfacing, concrete curb/sidewalk work, utility adjustments, traffic control, water‑pollution controls, landscaping, mailbox and sign post resetting, tree trimming, earthwork, and related public‑notification activities. The estimated construction cost is about $3.1 million, and the contract period is set at 130 working days. Bidders must hold a California Class A contractor license, provide required bonds (performance and payment bonds equal to 100 % of the contract sum), and comply with prevailing‑wage and labor‑code certifications. All bids must be submitted in sealed envelopes to the City Clerk by 2:00 p.m. on September 3, 2026. • Scope: pavement removal, HMA repaving, concrete curb/sidewalk, utility box adjustments, drainage, landscaping, signage, and traffic control. • Project size: ~28 city blocks (approximately 8,126 CY excavation, 6,777 TONS hot‑mix asphalt, etc.). • Estimated budget: $3,100,000. • Contract duration: 130 working days. • Required licenses/bonds: Class A contractor license, 10 % bid bond, 100 % performance & payment bonds. • Mandatory compliance: prevailing‑wage, labor‑code 1725.5 registration, equal‑employment certification. • Bid submission deadline: September 3, 2026, 2:00 p.m. (sealed, no fax). • Primary contact: Kristin Bennet (Bid Contact).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kristin Bennet(Bid Contact)

[email protected]

(805) 695-3569

Key dates

Opened
8/13/2026
Closes
9/3/2026
Duration
130 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
CIP 2295-19

Budget estimate

$2,800,000 – $3,500,000

The bid documents estimate the probable construction cost at approximately $3,100,000. Considering typical contractor profit margins (5‑10 %) and potential change‑order allowances, the net earnings for the successful bidder are likely to fall between roughly $2.8 M (lower‑end profit) and $3.5 M (higher‑end profit plus modest change orders). Factors influencing the final budget include the actual bid price submitted, any awarded change orders, and the contractor’s ability to manage labor‑hour efficiencies within the 130‑day schedule.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Hermosa Beach·California

Top match · 75%

CIP 106 - Annual Street Improvements Project

Closes 12/9/2026Opened 10/29/2026

City of Laguna Hills·California

73% match

Citywide Pavement Rehabilitation, CIP 101-M

Closes 12/1/2026Opened 10/29/2026

City of Santa Ana·California

72% match

Industrial Street Repair Program (Wilshire & Wright)

Closes 11/18/2026Opened 10/30/2026

City of Ontario·California

72% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of The Colony·Texas

72% match

Phase 15A Street Reconstruction

Closes 12/3/2026Opened 10/16/2026

City of Broken Arrow·Oklahoma

72% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

72% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

California Department of Transportation·California

71% match

Mod Sig & Ltg, Pvmt repair, SW, curb ramp, segmental Conc Ret system.

Closes 11/5/2026Opened 10/5/2026

City of Aberdeen·South Dakota

71% match

Award for 2026 Street Maintenance Concrete Repair II

Rolling / TBD closeOpened 8/25/2026

City of Hermosa Beach·California

71% match

CIP 623 - Pier Structural Repairs Project

Closes 11/12/2026Opened 10/15/2026

City of Fargo·North Dakota

71% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of San Antonio·Texas

71% match

23-04203-08 2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

City of Philadelphia·Pennsylvania

70% match

PW Prequalification Bid #3085 - 2800 Judson Street Rehabilitation Project

Closes 11/5/2026Opened 10/16/2026

West County Wastewater·California

70% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Vernon·California

70% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

The City of Anaheim·California

70% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

U.S. Department Of Defense·Missouri

70% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of West Covina·California

70% match

FY 25-26 Residential Street Rehab Project

Closes 11/12/2026Opened 10/29/2026

City of San Antonio·Texas

70% match

23-04203-05 2027 Street Rehabilitation Package 5 - Overlay

Closes 12/8/2026Opened 10/28/2026

Georgia City of Sandy Springs·Georgia

70% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Indianapolis·Indiana

70% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of Corning·California

69% match

Yolo Street Rehabilitation Project

Closes 11/4/2026Opened 9/23/2026

City of Maple Grove·Minnesota

69% match

26-02 - Patrick's Ridge and Rush Creek Villas Area Street Rehab

Closes 2/1/2027Opened 12/2/2025

City of Culver City·California

69% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

Illinois Tollway·Illinois

69% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026