Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Engineering Services
  5. ›Design Services for the I-5/SR113 Freeway Connector Project

City of Woodland·California

Design Services for the I-5/SR113 Freeway Connector Project

Closes 9/18/2026$1M – $5MRequest for QualificationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Woodland is seeking qualified engineering firms to provide professional design services for the I‑5/SR 113 Freeway Connector Project, which will create freeway‑to‑freeway connections between Interstate 5 and State Route 113. The scope includes amending the existing Project Report, completing Project Approval and Environmental Documentation (PA&ED), preliminary and final engineering, public outreach, surveying, subsurface utility location, geotechnical investigation, right‑of‑way work, and coordination with Caltrans for encroachment permits. Work will proceed from the amendment phase (target completion December 2027) through design, bidding, and construction support as funding becomes available. The contract will be on a time‑and‑materials basis with a not‑to‑exceed fee to be negotiated. • Amend and update the existing Project Report to reflect cost‑saving alternatives. • Conduct public outreach and environmental documentation (PA&ED). • Perform boundary, topographic, and geotechnical surveys, subsurface utility location, and utility coordination. • Prepare civil, site, and electrical design documents for the connector. • Provide right‑of‑way assistance and obtain Caltrans encroachment permits. • Deliver phased services: initial PA&ED, followed by preliminary engineering and final design as funding permits.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sara Andreotti(Engineering Assistant)

[email protected]

(530) 661-5820

Key dates

Opened
8/5/2026
Questions due
9/11/2026
Closes
9/18/2026
Duration
14 months

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330

Budget estimate

$1,000,000 – $5,000,000

The solicitation does not disclose a firm‑fixed price; compensation will be on a time‑and‑materials basis with a not‑to‑exceed (NTE) ceiling to be negotiated after selection. For a regional freeway connector design that includes environmental documentation, surveying, geotechnical work, and multiple design phases, typical engineering fees range from $1 million to $5 million depending on firm rates, scope refinements, and duration of construction‑phase support. Therefore, a reasonable estimate for the total contract value is $1 M–$5 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Greene County·Virginia

Top match · 72%

#SMART18 - Route 670 Connector A Design-Build Project

Closes 2/9/2027Opened 10/30/2026

City of Plano·Texas

71% match

RFQ Lavon Farms Connector - K Avenue to Jupiter Road | Project No. ENG-S-00033

Closes 12/9/2026Opened 10/26/2026

City of Cleveland·Ohio

70% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

City of Cleveland·Ohio

70% match

Active Transportation Quick Build Design Services

Closes 11/10/2026Opened 10/14/2026

MTA - NYC Transit (NYCT)·New York

70% match

Design Services for Travelers at the Bronx Whitestone (BW-9K) and Robert F. Kennedy (RK-9K) Bridges (State)

Closes 12/7/2026Opened 10/28/2026

Maryland Transportation Authority·Maryland

69% match

I-95 / I-695 INTERCHANGE EXPRESS TOLL LANES – RAMPS MB & MH

Closes 1/13/2027Opened 10/10/2025

MTA - NYC Transit (NYCT)·New York

69% match

Design Services for the 8th Avenue Manhattan Line Bundle

Closes 11/19/2026Opened 10/16/2026

Cobb County, GA·Georgia

69% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Washington Spokane Transit Authority·Washington

69% match

DOWNTOWN CHARGING & LAYOVER FACILITY DESIGN & ENGINEERING SERVICES

Closes 11/17/2026Opened 10/19/2026

MTA - NYC Transit (NYCT)·New York

69% match

CS00055B -Design Services for Various Projects at the RFK Bridge.

Closes 12/10/2026Opened 10/28/2026

City of Redlands·California

69% match

Church Street and San Bernardino Avenue Traffic Signal Installation

Closes 11/16/2026Opened 10/22/2026

City of Franklin·Tennessee

69% match

On Call Traffic Engineering Services COF Contract 2026-0442 Advertisement for Bid

Closes 11/23/2026Opened 10/28/2026

City of Redlands·California

69% match

Traffic Signal Head Improvements

Closes 11/16/2026Opened 10/22/2026

County of Ocean·New Jersey

69% match

Road Design Services, Various Locations throughout Ocean County

Closes 11/10/2026Opened 10/22/2026

City of Franklin·Tennessee

68% match

On-Call Traffic Engineering Services

Closes 11/23/2026Opened 10/28/2026

Georgia Cobb County Department of Transportation·Georgia

68% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Pinole·California

68% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

City of Columbus·Ohio

68% match

Roadway - N Knot - 315 at Lane Avenue

Closes 11/4/2026Opened 10/2/2026

City of San Antonio·Texas

68% match

23-04203-05 2027 Street Rehabilitation Package 5 - Overlay

Closes 12/8/2026Opened 10/28/2026

City of Adelanto·California

68% match

On-Call Traffic Engineering and Caltrans Coordination Services For Highway 395 at Lawson Avenue and Cortez Avenue

Closes 11/2/2026Opened 10/6/2026

MTA - NYC Transit (NYCT)·New York

68% match

Design Services for Stations on the Flushing Line (SOGR and ADA Work)

Closes 12/1/2026Opened 10/13/2026

Panola County Board of Supervisors·Mississippi

68% match

Northwest Community College School of Aeronautics Taxilane Connector Project

Closes 11/3/2026Opened 10/12/2026

Maryland State Highway Administration·Maryland

68% match

BCS 2026-06 Traffic Engineering and Design Services, Statewide

Closes 11/17/2026Opened 10/15/2026

County of Ocean·New Jersey

68% match

Bridge Design Services, Various Locations throughout Ocean County

Closes 11/10/2026Opened 10/22/2026

City of Pasadena·California

68% match

HSIP Cycle 11 Pedestrian Crossing Enhancements

Closes 11/19/2026Opened 10/26/2026