Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›SACRAMENTO RIVER TRAIL REPAVING GAOA

U.S. Department Of The Interior·California

SACRAMENTO RIVER TRAIL REPAVING GAOA

Closes 9/3/2026$1.4M – $2.8MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bureau of Land Management is seeking a contractor to repave approximately 14.04 miles of the Sacramento Rail Trail system near Redding, California. The project includes the Shasta Dam Trail, Keswick Dam Trail, and Middle Creek Trail segments. The existing asphalt pavement exhibits transverse and longitudinal cracking, localized structural failures, and shoulder degradation. The contractor will be responsible for furnishing all labor, equipment, materials, supervision, and incidentals necessary to complete the pavement rehabilitation. The project consists of localized "remove and replace" patching, surface preparation, crack sealing, asphalt overlay, and shoulder backing. The contractor must comply with all applicable federal, state, and local safety standards and regulations. • The project requires the contractor to restore pavement integrity, maintain ABA accessibility, improve user safety, and extend the service life of the trail system. • The contractor must provide a professional appearance and be able to provide appropriate identification. • The contractor must comply with all federal and state laws relative to citizenship. • The contractor must inform any trespassers along the right of way of hazards and ask them to leave fenced off or restricted areas. • The contractor must notify the On-Site Foreman if they encounter emergency personnel, policemen, or firemen along the right of way.

Attached files

Contact

John Cabral(Primary Contact)

[email protected]

(707) 438-5293

Key dates

Opened
5/15/2026
Closes
9/3/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
140L1226R0005

Budget estimate

$1,404,000 – $2,808,000

The budget for this project can be estimated based on the scope of work and the materials required. The project requires the repaving of approximately 14.04 miles of trail, which is a significant undertaking. The cost of materials, labor, and equipment will be substantial. Based on industry standards, the cost of repaving a mile of trail can range from $100,000 to $200,000. Therefore, the total budget for this project can be estimated to be between $1,404,000 and $2,808,000. This is a rough estimate and the actual budget may vary depending on various factors, including the complexity of the project, the location, and the contractor's experience.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Alaska Department of Transportation and Public Facilities·Alaska

Top match · 65%

RTP Grant Application - Rehabilitation of Multi-Purpose Trail in Galena

Rolling / TBD closeOpened 9/24/2026

City of Green Bay·Wisconsin

64% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Fresno·California

63% match

River West Fresno Eaton Trail Extension Phase 1

Closes 11/20/2026Opened 10/21/2026

City of Elko·Nevada

63% match

HARP Trail Extension-Re

Closes 11/2/2026Opened 8/25/2026

Kenosha County·Wisconsin

63% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Agriculture·California

63% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

California Grants·California

62% match

The Recreational Trails Program (RTP) – R27

Closes 11/2/2026Opened 10/1/2026

California Grants·California

62% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

California Grants·California

62% match

Proposition 68 Rivers and Streams Grant Program

Rolling / TBD closeOpened 6/18/2025

Minnesota Department of Administration·Minnesota

61% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

California Grants·California

61% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

California Grants·California

61% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

Alaska Recreational Trails Program·Alaska

61% match

RTP Grant Application - Bonita Loop

Rolling / TBD closeOpened 9/24/2026

City of Sacramento·California

61% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

California Grants·California

61% match

Wildlife Corridor and Fish Passage

Rolling / TBD closeOpened 6/18/2025

Cobb County·Georgia

61% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Elk Grove·California

60% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

California Grants·California

60% match

Nature Based Solutions – Wildlife Corridors

Rolling / TBD closeOpened 6/16/2025

California Grants·California

60% match

Grants and Cooperative Agreements Program (GCA)- G25

Rolling / TBD closeOpened 3/6/2025

Alaska Recreational Trails Program·Alaska

60% match

RTP Grant Application - Girdwood Beaver Pond Trail

Rolling / TBD closeOpened 9/24/2026

California Grants·California

60% match

Proposition 1 Delta Water Quality and Ecosystem Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

California Grants·California

60% match

Proposition 1 Watershed Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

California Department of Transportation·California

60% match

Colorado River bridge replacement.

Closes 12/17/2026Opened 10/26/2026

California Grants·California

60% match

Proposition 68 Fish and Wildlife Improvement Grant Program

Rolling / TBD closeOpened 4/8/2025

Alaska Department of Transportation & Public Facilities·Alaska

60% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026