Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›Infrastructure Improvements in the Dupont-Wappoo Watershed

City of Charleston·South Carolina

Infrastructure Improvements in the Dupont-Wappoo Watershed

Closes 10/16/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Charleston is seeking contractors to perform drainage improvements along and behind Orleans Road, spanning from approximately Florence Lane to Hazelwood Drive. The project follows a Design‑Bid‑Build delivery method, with bid submissions due on October 16, 2026. This work aims to enhance stormwater conveyance, reduce flooding risk, and improve roadway safety within the Dupont‑Wappoo Watershed area. • Scope includes grading, installation of new drainage structures, pipe replacement, and associated road work. • Project location is near Orleans Rd, Charleston, SC, affecting a corridor between Florence Ln and Hazelwood Dr. • Contractor must be capable of civil construction, possess experience with municipal drainage systems, and meet the city’s bid and insurance requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jordyn Mallett(Agency Project Coordinator)

[email protected]

(843) 579-6419

Key dates

Opened
9/28/2026
Closes
10/16/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310

Budget estimate

$500,000 – $2,000,000

Based on typical municipal drainage projects of this length (approximately a few miles of road) and the need for grading, pipe installation, and road resurfacing, total construction costs are often in the low‑to‑mid‑million‑dollar range. Assuming a modest scope, a low estimate around $500,000 and a high estimate near $2,000,000 are reasonable. Factors influencing the final amount include soil conditions, existing utility conflicts, and any required environmental mitigation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Douglas·Wyoming

Top match · 69%

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Douglas·Wyoming

69% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Waconia·Minnesota

68% match

Waconia, City of Highway 5 Phase 2 – BMI No. 0C1.128660 – SP 1002-131, SP 231-010-010, SP 231-110-004

Closes 11/10/2026Opened 10/16/2026

West County Wastewater·California

68% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Casper·Wyoming

68% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

City of Charlotte·North Carolina

67% match

Irwin Creek WWTP Stormwater Improvements Project

Rolling / TBD closeOpened 5/1/2026

City of Lynchburg·Virginia

67% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

City of Fresno·California

67% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

City of Waukegan·Illinois

67% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

Washington Suburban Sanitary Commission, MD·Maryland

67% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

Village of Cary·Illinois

67% match

RFQ-P Well No. 4 and WTP Phase II and III Engineering Services 11.20.26

Closes 11/6/2026Opened 10/20/2026

Town of Eatonville·Florida

67% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Idaho Transportation Department·Idaho

67% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

U.S. Department Of The Interior·Utah

66% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

Town of Burke·Vermont

66% match

West Burke Village Wastewater

Closes 11/5/2026Opened 10/8/2026

City of Shawnee·Kansas

66% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Lebanon·Indiana

66% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

Mississippi Department of Finance and Administration·Mississippi

66% match

Wastewater Facility Improvements (Sanitary Sewer) (GS# 101-309)

Closes 11/19/2026Opened 10/20/2026

California Grants·California

66% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

Environmental Conservation, NYS Department of·New York

66% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

City of Ketchikan·Alaska

66% match

26-21 Water Street Sewer Improvements Phase B - Hopkins Alley to Front Street

Closes 11/20/2026Opened 10/30/2026

City of Charlotte·North Carolina

66% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026