The Dexter Community Schools is seeking a proposal for the construction of a field house at Dexter High School. The proposal should include support reactions for each load group, load combination maximum reaction tables, and other technical details. The field house will have a mezzanine, and the loads considered include dead load, live load, collateral load, snow load, and seismic load. The proposal should also include information about the foundation design and the application of load factors and load combinations.
• The field house will have various load groups, including roof dead load, roof live load, and collateral load.
• The load combination maximum reaction tables will be used to determine the maximum reactions for each load combination.
• The proposal should include information about the seismic design and the application of seismic loads.
• The field house will have a mezzanine with a dead load and live load.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.