The State of Tennessee is seeking a qualified contractor to construct a 1.5‑mile roller‑compacted concrete (RCC) greenway within Roan Mountain State Park. The work includes subgrade preparation, 4‑in. #33C stone sub‑base installation, bridge and boardwalk transitions with gabion and rip‑rap, placement of a single 4‑in. RCC lift, compaction, shoulder preparation, seeding, and final site cleanup, all completed by October 1 2026. The contract will be awarded to the lowest responsive and responsible bidder and requires an active Tennessee contractor license (BC‑B, BC‑C, BC‑19, or HRA‑B) and compliance with state insurance, bonding, and tax registration requirements.
• 1.5 mi (≈ 7,920 ft) RCC pavement, 5 ft wide, with sub‑base and bridge transitions.
• Required $50,000 allowance for unsuitable soil remediation; one‑year workmanship warranty.
• Mandatory licenses, insurance, performance/pay‑bond (≥ 100 %/25 % of max liability) and compliance with non‑discrimination, debarment, and Iran Divestment Act certifications.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.