Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›Dale Stone Park Playground Replacement

City of Toledo·Ohio

Dale Stone Park Playground Replacement

Closes 3/3/2026$250k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Toledo is seeking a qualified contractor to replace the existing playground at Dale Stone Park. The scope includes demolition of the current play structures and associated site elements, installation of new city‑provided playground equipment, construction of footers, installation of an under‑drain system and French drain, placement of engineered wood mulch, topsoil, seeding, and related landscaping, as well as perimeter fencing. The work must be completed within a 90‑day period after award and must comply with prevailing‑wage requirements, a Project Labor Agreement, and extensive documentation (insurance, bonds, child‑support affidavit, etc.). • Demolition of existing equipment, concrete, rubber mats, mulch, and drainage components (~3,155 sf). • Installation of new footers, under‑drain (≈190 lf perforated pipe) and French drain (≈33 lf SDR‑35 pipe), engineered wood mulch (≈130 cu yd), topsoil (≈13 cu yd), and seeding (≈156 sq yd). • Coordination with City Forestry for mulch pickup and with Gametime Recreation for equipment installation; compliance with PLA, prevailing‑wage, insurance, and bonding requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
2/13/2026
Questions due
2/25/2026
Closes
3/3/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
10008477

Budget estimate

$250,000 – $500,000

Based on the scope—demolition, extensive drainage work, footers, topsoil, mulch, and installation of city‑provided playground equipment—a mid‑size municipal playground replacement typically ranges from $250 k to $500 k. The low end assumes minimal site complications and standard equipment; the high end reflects higher labor rates (prevailing‑wage), extensive drainage, and potential subcontractor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lauderhill·Florida

Top match · 66%

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026Opened 10/2/2026

City of Lauderhill·Florida

65% match

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026Opened 10/2/2026

City of Cleveland, Georgia·Georgia

64% match

RFP Playground Equipment, Safety Surfaces, Delivery and Installation

Closes 11/20/2026Opened 10/19/2026

San Gabriel Unified School District·California

64% match

2026-Bid-SG-05_Addendum Three_Narrative - Roosevelt ES Playground Replacement

Rolling / TBD closeOpened 7/29/2026

Arkansas

64% match

NW Park Tree Replacement

Rolling / TBD closeOpened 8/30/2026

City of Encinitas / San Dieguito Water·California

64% match

Park Equipment Replacement at Wiro and Orpheus Parks

Closes 11/12/2026Opened 10/15/2026

Boston Public Schools·Massachusetts

64% match

Playground Surface Replacement

Closes 11/12/2026Opened 10/28/2026

City of Goose Creek·South Carolina

64% match

Creekside Park Renovations

Closes 11/30/2026Opened 10/30/2026

City of Delphos·Kansas

63% match

A Place To Play - Park Improvements - Delphos, KS

Closes 11/2/2026Opened 9/28/2026

City of Fresno·California

63% match

Logan Park Swings Project

Closes 11/3/2026Opened 10/5/2026

Georgia City of Bloomingdale·Georgia

63% match

Taylor Park Improvements- Phase 1

Closes 11/30/2026Opened 10/30/2026

San Gabriel Unified School District·California

63% match

2026-Bid-SG-05_Addendum Three_Drawing - Roosevelt ES Playground Replacement

Rolling / TBD closeOpened 8/4/2026

Town of Cheraw·South Carolina

63% match

Upgrading Playground Equipment at Arrowhead Park

Closes 11/2/2026Opened 9/24/2026

San Gabriel Unified School District·California

62% match

San Gabriel USD - Roosevelt ES Playground - DIV 01

Rolling / TBD closeOpened 8/4/2026

City of Duarte·California

62% match

Duarte Park Redevelopment: Phase II

Closes 11/23/2026Opened 10/28/2026

Connecticut Town of Cheshire·Connecticut

61% match

2627-04 Pavilion Replacement at Mixville Park

Closes 11/10/2026Opened 10/13/2026

City of Elgin·Illinois

61% match

Wing Park Renovation

Closes 11/24/2026Opened 9/25/2026

Pierce County·Washington

61% match

Gonyea Playfield

Closes 11/18/2026Opened 10/16/2026

Maryland Montgomery County Public Schools·Maryland

61% match

Richard Montgomery HS and Walt Whitman HS Artificial Turf Field Replacement

Closes 11/19/2026Opened 10/28/2026

Gwinnett County Government·Georgia

61% match

E.E. Robinson Park Pickleball Courts Replacement Project

Closes 12/16/2026Opened 10/24/2026

San Gabriel Unified School District·California

61% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

Miami-Dade County·Florida

61% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

San Gabriel Unified School District·California

61% match

2026-Bid-SG-05_Addendum One_Narrative - Roosevelt ES Playground Replacement

Rolling / TBD closeOpened 8/4/2026

Massachusetts City of Boston·Massachusetts

60% match

IFB - PLAYGROUND SURFACE REPLACEMENT

Closes 11/12/2026Opened 10/28/2026

Connecticut Town of Cheshire·Connecticut

60% match

2627-04 Pavilion Replacement at Mixville Park

Closes 11/10/2026Opened 10/13/2026