The University of Massachusetts Chan Medical School is seeking bids to renovate the seventh‑floor ACC building into a clinical‑trial unit. The scope covers full interior demolition, new construction of walls, ceilings, flooring, finishes, doors, millwork, and comprehensive MEP upgrades—including HVAC, lighting, power, low‑voltage, plumbing, and fire‑protection systems. Eight trade‑specific filed sub‑bids are required (glass & glazing, acoustical tile, resilient flooring, painting, fire‑sprinkler, plumbing, HVAC, electrical), all of which must be DCAMM‑certified. A mandatory pre‑bid conference/site visit is scheduled for August 26, 2026, and all bids must be submitted electronically by September 2, 2026. The project’s estimated construction cost is $3.5 million.
• Renovate ~7,400 sf of office space to clinical‑trial labs and infusion areas.
• Requires trades: glass & glazing, acoustical tile, resilient flooring, painting, fire‑sprinkler, plumbing, HVAC, electrical.
• Mandatory pre‑bid meeting on 26 Aug 2026; electronic bids only; DCAMM certification required.
• Estimated construction cost $3.5 M; bid deadline 2 Sep 2026.