Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Engineering Services
  5. ›Engineering Services for Richland Chambers Lake Pump…

Tarrant Regional Water District·Texas

Engineering Services for Richland Chambers Lake Pump Station Chemical Improvements

Closes 10/20/2026$500k – $2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Tarrant Regional Water District (TRWD) seeks a qualified engineering consulting firm to provide full‑service design, permitting, procurement support, and construction‑phase engineering for chemical‑feed improvements at the Richland‑Chambers Lake Pump Station (RC1). The scope includes project management, preliminary investigations, preliminary and final design, permitting, and procurement‑phase services for new sodium hypochlorite storage, secondary containment, chemical piping, conversion of aqua‑ammonia to liquid ammonium sulfate, and demolition of existing chlorine systems. The selected firm will develop a comprehensive design package, coordinate multidisciplinary disciplines, and support TRWD through construction administration (later awarded separately). • Design of bulk sodium hypochlorite storage tank and feed skid • Chemical‑resistant secondary containment and protected piping routes • Conversion of aqua‑ammonia system to liquid ammonium sulfate (LAS) • Demolition of gaseous chlorine storage, feed system, and scrubber • Multidisciplinary engineering (mechanical, civil, structural, electrical, controls, SCADA) • Permitting, cost estimating, scheduling, constructability review, startup & commissioning support • Project management and coordination with TRWD staff and other contractors • Pre‑submittal site visit on 23 Sep 2026 (non‑mandatory) and electronic SOQ submission by 20 Oct 2026

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

John Logan(Buyer)

[email protected]

(936) 662-1672

Key dates

Opened
9/5/2026
Questions due
10/6/2026
Pre-bid meeting
9/23/2026
Closes
10/20/2026

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330
Solicitation №
26-179

Budget estimate

$500,000 – $2,000,000

The solicitation does not disclose a contract value. Based on comparable water‑utility pump‑station chemical‑feed upgrade designs in Texas, a full‑scope engineering contract (pre‑design through construction‑phase support) typically ranges from $0.5 million to $2 million, depending on the depth of design, permitting complexity, and procurement services required. Factors influencing the final amount include the size of the new storage tank, extent of demolition, and the level of construction‑administration services later awarded.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Central Arkansas Water·Arkansas

Top match · 71%

Consulting Engineering Services for Lake Maumelle Pump Station Condition Assessment and Preliminary Engineering Study

Closes 11/5/2026Opened 9/27/2026

St. John the Baptist Parish Government·Louisiana

71% match

RFQ 2026.30 Engineering Services for Vicknair Canal Pump Station

Closes 11/19/2026Opened 10/28/2026

City of Lawrence·Kansas

71% match

MS-220015A Lawrence Pump Station 9 Improvements

Closes 12/8/2026Opened 10/27/2026

City of Stillwater·Oklahoma

71% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

Johnson County Wastewater·Kansas

71% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

Carroll County·Maryland

70% match

Design Upgrades to the Sykesville Pumping Station

Closes 12/9/2026Opened 10/21/2026

City of Charlotte·North Carolina

70% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Charles County Government·Maryland

70% match

Cobb Island and Hill Road Pump Station Improvements (UN 1308\UN 1309)

Closes 11/4/2026Opened 9/24/2026

City of Hilliard, Ohio·Ohio

70% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

Maryland Carroll County Government - Procurement·Maryland

70% match

Design Upgrades to the Sykesville Pumping Station

Closes 12/9/2026Opened 10/22/2026

Gwinnett County Government·Georgia

70% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Brazos Valley·Texas

70% match

Well 6 Capacity Enhancement

Closes 11/12/2026Opened 10/21/2026

Georgia Pa​ulding County Water System·Georgia

69% match

27012-3802, Richland Creek WTP Pressure Reducing Valve & Flow Meter Vault

Closes 11/13/2026Opened 10/9/2026

City of San Diego·California

69% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

Jackson County Utility Authority·Mississippi

69% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

City of Hollywood·Florida

69% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

Massachusetts Town of Marion·Massachusetts

68% match

Creek Road Pump Station Resiliency Improvements

Closes 12/2/2026Opened 10/21/2026

City of Waynesboro·Virginia

68% match

Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I

Closes 11/10/2026Opened 9/30/2026

City of Missouri City - Purchasing·Texas

68% match

MUSTANG BAYOU WATER PLANT #2 WELL IMPROVEMENTS

Closes 11/6/2026Opened 10/21/2026

City of Alexandria·Louisiana

68% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

City of Lake Charles·Louisiana

68% match

CITY OF LAKE CHARLES, LOUISIANA HAZARD MITIGATION GRANT PROGRAM (HMGP) LIFT STATION BACK‑UP POWER IMPROVEMENTS

Closes 11/17/2026Opened 10/22/2026

City of Hollywood·Florida

68% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

The Metropolitan Water District of Southern California·California

68% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

City of Lakeland·Florida

68% match

ANNUAL ROTATING EQUIPMENT INSPECTION, TESTING, REPAIR, RECONDITIONING AND STORAGE SERVICES

Closes 11/6/2026Opened 10/9/2026

City of Redding·California

68% match

Overhaul of Two (2) Boiler Feedwater Pumps, Motors & Valves

Closes 12/4/2026Opened 10/26/2026