Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arkansas guideArkansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arkansas
  4. ›Construction
  5. ›Pedestrian Bridge at Desoto Park

Hot Springs National Park·Arkansas

Pedestrian Bridge at Desoto Park

Closes 9/25/2026$1M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Hot Springs, Arkansas has issued an Invitation to Bid for the design‑build construction of a new pedestrian bridge spanning Desoto Park. The bid opening is scheduled for September 14, 2026, with a closing deadline of September 25, 2026 at 5:00 PM. The notice is a “Notice of Intent to Award,” indicating that the city intends to award the contract shortly after the bid period, pending protest resolution. The project will require a qualified construction firm (or a joint venture) capable of delivering a structurally sound, ADA‑compliant bridge, including site preparation, foundations, superstructure, decking, railings, lighting, and any required environmental mitigation. The successful bidder must comply with the city’s purchasing manual, submit all required bid documents, and be prepared for potential protests within five business days of award. • Scope: Full design‑build of a pedestrian bridge (engineering, permitting, construction, and close‑out). • Location: Desoto Park, Hot Springs, Arkansas. • Bid opening: September 14 2026; bid closing: September 25 2026 5 PM. • Mandatory protest filing deadline: September 25 2026 5 PM. • No pre‑bid meeting or site visit is indicated. • Contractor must be able to meet local, state, and federal construction standards.

Attached files

Key dates

Opened
9/18/2026
Closes
9/25/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
HS-26-058

Budget estimate

$1,000,000 – $3,000,000

Based on typical municipal pedestrian bridge projects of moderate span (30‑60 ft) in the United States, construction costs generally range from $1 million to $3 million, depending on site conditions, material choices (steel vs. concrete), design complexity, and required amenities such as lighting and decorative elements. Assuming standard design and modest site work, the likely contract value for this project would fall within that $1‑3 million band.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Kearney·Missouri

Top match · 64%

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

63% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Connecticut Town of Cheshire·Connecticut

63% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

City of Fort Myers·Florida

63% match

John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Closes 11/16/2026Opened 10/7/2026

Missouri Department of Transportation·Missouri

61% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026

Connecticut Town of Cheshire·Connecticut

61% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Minnesota Department of Administration·Minnesota

61% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

City of Palm Springs·California

61% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

City of Creve Coeur·Missouri

61% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

Missouri Department of Transportation·Missouri

61% match

SE District, City of Poplar Bluff, PB Pine Street Crossing project

Closes 11/3/2026Opened 10/6/2026

BREC·Louisiana

61% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Delaware River Joint Toll Bridge Commission·New Jersey

60% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Camden County·New Jersey

60% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Columbia·Missouri

60% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

Maryland Department Of General Services·Maryland

60% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

Georgia City of Chattahoochee Hills·Georgia

59% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

U.S. Department Of Transportation·Hawaii

59% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

U.S. Department Of Transportation·Wyoming

59% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/28/2026

City of Tustin·California

59% match

Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)

Closes 12/10/2026Opened 10/28/2026

City of Etowah·Arkansas

59% match

PARK IMPROVEMENTS TO INCLUDE EXTENSION OF WALKING TRAIL, REPAIR OF EXISTING WALKING TRAIL AND OTHER IMPROVEMENTS

Closes 11/10/2026Opened 10/18/2026

Cherokee Nation·Oklahoma

59% match

Bridge 67 over Pecan Creek (Coos Thompson)

Closes 11/10/2026Opened 10/5/2026

Division of Highways·North Carolina

59% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

New York City Department of Transportation·New York

59% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

59% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

City of Gainesville - Procurement Division·Florida

59% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026