The City of Toledo is seeking a qualified contractor to investigate, document, and repair a sink‑hole beneath the synthetic‑turf ballfield at Danny Thomas Park. The work requires forensic excavation, drainage inspection, subsurface repairs, and full restoration of the turf system to a safe, playable condition, including seam sewing, infill replacement, and impact‑attenuation testing. The contract is awarded on a “as‑is” basis, requires compliance with prevailing‑ and living‑wage statutes, and mandates extensive documentation and warranty provisions.
• Conduct forensic excavation to determine cause and extent of subsurface failure, including CCTV pipe inspections.
• Perform required underground repairs, back‑fill, compaction, and restore the synthetic‑turf system (removal, cleaning, re‑installation, seam sewing, infill reinstatement, and HIC testing).
• Provide comprehensive documentation (photos, investigation logs, drainage sketches, compaction reports, final grade, and test results) and maintain warranty for workmanship.