Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Renovation of the Fish Collection Facility on the Toutle…

U.S. Department Of Defense·Oregon

Renovation of the Fish Collection Facility on the Toutle River

Closes 5/25/2026$500k – $2MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Army Corps of Engineers, Portland District is seeking sources for the renovation of the Fish Collection Facility on the Toutle River. The project includes the installation of a new System Acquisition and Control System (SCADA) consisting of hardware and software. The primary purpose of this control system is to monitor and maintain the proper water levels on the newly constructed fish ladder to attract fish into the facility. The contractor supplied hardware must be capable of executing the Government-generated software, which is Allen Bradley Studio 5000. The required Programmable Logic Controller (PLC) equipment includes analog input modules, digital input modules, digital output modules, relay output modules, and a main controller that operates over Ethernet/IP protocol using CAT6 hardware. • The project requires the installation of a new SCADA system with hardware and software. • The contractor supplied hardware must be compatible with Allen Bradley Studio 5000 software. • The required PLC equipment includes analog input modules, digital input modules, digital output modules, relay output modules, and a main controller. • The project also requires the installation of variable frequency drives (VFD or ASD) operating motors from 3 hp to 50 hp. • The contractor must provide a list of projects where their equipment has been successfully used. • The contractor must show that their PLC equipment can run Allen Bradley Studio 5000 software.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

David M. Cook(Contract Specialist)

[email protected]

Key dates

Opened
5/8/2026
Closes
5/25/2026

Last updated

Details

Type
Sole Source
Industry
Construction
NAICS
237990
Solicitation №
PAN26P29638

Budget estimate

$500,000 – $2,000,000

The budget for this opportunity is difficult to estimate because the document does not specify the budget or the payment terms. However, based on the scope of the project, which includes the installation of a new SCADA system and other construction work, the budget could be in the range of $500,000 to $2 million. The factors that may influence the likely payment range include the complexity of the project, the materials and equipment required, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Illinois Natural Resources·Illinois

Top match · 68%

DJ - Sport Fish Restoration - Fisheries, Boat Access (FY24)

Rolling / TBD closeOpened 3/8/2023

Clean River Partners·Minnesota

68% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

Illinois Natural Resources·Illinois

67% match

DJ - Sport Fish Restoration - Fisheries, Boat Access (FY25)

Rolling / TBD closeOpened 1/1/2024

Illinois Natural Resources·Illinois

67% match

Invasive Carp removal and monitoring in the Upper Mississippi River FY26

Rolling / TBD closeOpened 6/1/2025

Illinois Natural Resources·Illinois

67% match

Invasive Carp removal and monitoring in the Upper Mississippi River (CAFWS-181)

Rolling / TBD closeOpened 1/1/2026

U.S. DOC NOAA - ERA Production·United States of America

66% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

Illinois Natural Resources·Illinois

66% match

DJ - Sport Fish Restoration - Fisheries, Boat Access (FY27)

Rolling / TBD closeOpened 1/1/2026

Massachusetts Department of Fish and Game·Massachusetts

66% match

DMF Municipal Fish Passage Restoration Grant

Closes 2/26/2027Opened 2/26/2024

U.S. Department Of Defense·Kentucky

66% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Defense·Florida

66% match

Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)

Closes 11/11/2026Opened 10/27/2026

Illinois Natural Resources·Illinois

66% match

Illinois support of Upper Mississippi River Asian Carp control and management (FY25)

Rolling / TBD closeOpened 6/1/2024

U.S. Fish and Wildlife Service·United States of America

66% match

F26AS00062: Great Lakes Fish and Wildlife Restoration Act FY 2026

Rolling / TBD closeOpened 6/1/2026

New York City Department of Environmental Protection·New York

66% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Santa Clara Valley Water District·California

66% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

Illinois Natural Resources·Illinois

66% match

DJ - Sport Fish Restoration - Fisheries, Boat Access (FY26)

Rolling / TBD closeOpened 1/1/2025

Washakie County Conservation District·Wyoming

65% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

California Department of Transportation·California

65% match

Construct bridge structure for fish passage restoration.

Closes 12/3/2026Opened 10/12/2026

U.S. Department Of Defense·Illinois

65% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025

U.S. Fish and Wildlife Service·United States of America

65% match

F26AS00105 National Fish Passage Program

Closes 4/30/2027Opened 8/24/2026

James City County·Virginia

65% match

Chickahominy Riverfront Park Pool

Closes 11/9/2026Opened 10/9/2026

Lake Superior State University·Michigan

65% match

Architectural/Engineering Services for the CFRE Fish Hatchery

Closes 12/1/2026Opened 10/26/2026

Illinois Natural Resources·Illinois

65% match

Illinois support of Ohio River Basin Asian Carp control and management (FY26)

Rolling / TBD closeOpened 6/1/2025

Illinois Natural Resources·Illinois

65% match

Illinois support of Ohio River Basin Asian Carp control and management (FY25)

Rolling / TBD closeOpened 6/1/2024

Laramie Rivers Conservation District·Wyoming

65% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

U.S. Department Of The Interior·Idaho

65% match

Z--ID-KOOSKIA NATIONAL FISH- GUTTER RPLCMNT

Closes 11/17/2026Opened 10/28/2026