Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Construction
  5. ›CSN North Las Vegas Campus T Building Evaporative Cooler…

Nevada Government·Nevada

CSN North Las Vegas Campus T Building Evaporative Cooler Replacement

Closes 12/16/2025$100k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The College of Southern Nevada (CSN) is seeking bids for the replacement of evaporative coolers at the North Las Vegas Campus T Building. The project includes removing and replacing evaporative coolers and duct work. The contractor will be responsible for providing all personnel, materials, supplies, tools, equipment, and travel to complete the project. The project must be completed within 90 days from the notice to proceed. The contractor will be required to coordinate with CSN to minimize conflict and facilitate CSN's operations. • The project includes a turn-key project to replace the Evaporative Coolers on CSN North Las Vegas Campus, T Building. • The contractor will be responsible for providing all materials to complete the project. • The contractor will be required to provide finished as-builts upon request. • The contractor will be required to assign a project manager for the project to provide CSN with a single point of contact. • The contractor will be responsible for maintaining clean premises and ensuring the safety of CSN's students and staff.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Annette Lord(Contracts Administrator)

[email protected]

(702) 651-2970

Key dates

Opened
11/12/2025
Questions due
11/25/2025
Pre-bid meeting
11/19/2025Mandatory
Site visit
11/19/2025Mandatory
Closes
12/16/2025
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
IFB-26-0916

Budget estimate

$100,000 – $500,000

Based on the scope of work, which includes replacing evaporative coolers and duct work, the estimated budget for this project could be between $100,000 to $500,000. This estimate is influenced by the complexity of the project, the materials required, and the labor costs. However, without more detailed information about the specific requirements and the number of evaporative coolers to be replaced, it is difficult to provide a more precise estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Northern Virginia Community College·Virginia

Top match · 66%

260-B6260-003 MTS Replace Rooftop Unit

Closes 11/2/2026Opened 10/1/2026

University of South Carolina·South Carolina

65% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

Trident Technical College·South Carolina

65% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

Nevada Government·Nevada

64% match

LVMPD ARC HVAC Maintenance

Closes 11/5/2026Opened 10/12/2026

Mississippi State University·Mississippi

64% match

Trane Condenser, Evaporator Coil & TXV Replacement

Closes 11/3/2026Opened 10/14/2026

Northern Virginia Community College·Virginia

64% match

260-B5260-015 NVCC LC Relocate Fitness Center

Closes 11/10/2026Opened 9/24/2026

Nevada Adjutant General·Nevada

64% match

OTAG Water Heater Replacement

Closes 11/24/2026Opened 10/23/2026

Trident Technical College·South Carolina

63% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

University of Massachusetts System·Massachusetts

63% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

University of Missouri-Kansas City·Missouri

63% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

Louisiana's Community and Technical College System·Louisiana

63% match

HVAC Rooftop Units / Chiller Replacement, Northshore Technical Community College, #085 / F.01004592

Closes 11/23/2026Opened 10/22/2026

Nevada State Public Works Division·Nevada

63% match

Roofing Replacement, CSMS, NVNG, Carson City (25-S01g)

Closes 11/17/2026Opened 9/30/2026

North Carolina Southwestern Community College·North Carolina

62% match

Founders Building Hot Water system rennovation

Closes 11/12/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·Illinois

62% match

36C25227Q0048 - COOLERS AND FREEZER

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Commerce·Arizona

62% match

J--HVAC Unit Replacement

Closes 11/20/2026Opened 10/23/2026

City of Richmond Schools·Virginia

62% match

IFB 26-7167-10 Turnkey Walk-In Cooler/Freezer Combination Replacement-Southampton

Closes 11/6/2026Opened 10/6/2026

Connecticut UConn Health Center·Connecticut

62% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

62% match

41--COOLER,AIR,EVAPORATIVE

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

62% match

16--EVAPORATOR FAN,AIRC, IN REPAIR/MODIFICATION OF

Closes 11/17/2026Opened 8/19/2026

Northeastern Technical College·South Carolina

62% match

Replace Trane A/C Coil for 7.5-ton Unit

Closes 9/9/2027Opened 9/2/2026

U.S. Department Of The Interior·Massachusetts

62% match

41--Remove and Replace Walkin Cooler and Freezer

Closes 11/5/2026Opened 10/16/2026

University of South Carolina·South Carolina

62% match

Chiller and Infrastructure Replacement- North E #2

Closes 11/4/2026Opened 9/26/2026

NYS OGS Design & Construction - Construction Contractors·New York

62% match

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Virginia Department of Transportation·Virginia

61% match

161109 VDOT Lynchburg Admin Building Chiller Rep

Closes 11/23/2026Opened 10/23/2026

City of Orangeburg·South Carolina

61% match

HVAC System Replacement for North Road Recreation Complex

Closes 11/6/2026Opened 10/6/2026