The U.S. Army Corps of Engineers, Walla Walla District, is issuing a sole‑source justification to procure Basler Digital Excitation Controller Retrofit Upgrade Kits, spare parts, and electronic cabinets for three hydroelectric facilities (Lower Monumental, Lower Granite, and Little Goose Dams). The contract will be a Firm‑Fixed‑Price supply agreement with Basler Electric, the exclusive manufacturer of the required equipment. The kits will replace outdated Andritz THYNE 5 excitation system controls, bring the dams into compliance with current standards, and include onsite verification of existing equipment layouts. The effort is fully funded by Bonneville Power Administration Small‑Cap funding and is intended to standardize control systems across the three dams, reducing spare‑parts inventory, training, and cybersecurity compliance costs.
• Sole‑source award to Basler Electric (CAGE 97520) for 15 digital excitation controller retrofit kits, 3 spare‑parts packages, and 12 electronic cabinets.
• Equipment will be installed on Powerhouse Generator units at Lower Monumental (units 4‑6), Little Goose (units 1‑6), and Lower Granite (units 4‑6).
• Includes onsite verification services prior to design approval.
• Funding: Small‑Cap BPA funds; total estimated cost not disclosed in the notice.
• No competitive solicitation; interested parties may express interest by 11:00 AM PDT, Oct 2 2026.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.