Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Environmental Services
  5. ›Big Rock Wetland Restoration

NYS Save the Sound·New York

Big Rock Wetland Restoration

Closes 8/24/2026$1M – $5MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Project SummaryRestoration of wetland areas along Douglas Road through the removal and replacement of invasive species with native plants. Project includes establishing wetland drainage channels and installing nearshore oyster castle wave attenuators. Furthermore, wetland areas and Development landward of the wetland comprises construction of a Live Timber Crib Wall and Revetment Toe along with installation of Brush Mattresses. The purpose of this project is to restore and enhance an existing tidal marsh to a more functioning wetland to mitigate adverse impacts on wetland structure and function, improve coastal resiliency and minimize local flooding, promote marsh migration to mitigate effects of sea level rise, enhance horseshoe crab spawning habitat, provide substrate for oyster reef generation, create more diverse habitats for wildlife, and increase water quality by reducing impacts of nutrient loading from groundwater sources. This will be accomplished through the following proposed living shoreline components: Excavation of Phragmites australis with the rhizomes and replanting of intertidal and high marsh plants; Creation of a drainage channel through the restored marsh bounded by coir logs; Installation of oyster castles along the edge of the restored marsh and the seaward side of the eroded marsh; Cutting back the existing bank and removal of stone along the shorefront of Memorial Field flattening the slope to allow for marsh migration. The bottom of the regraded slope will be planted to tidal marsh plants and above to a native grass/wildflower buffer; Slope stabilization along the southern end of the project with brushmattress; Slope stabilization within the steep sloped mid-section with a Live Timber Crib Wall and stone toe, and wetland plantings on the flatter areas; The northern high-energy segment will be stabilized with a hybrid vegetated stone revetment, live stakes & salt shrubs. Bid DocumentsProspective Bidders can obtain Bid and Contract documents by sending an email to the following address stating their interest in the bid: [email protected]. Once we get your email you will be registered in our list and receive a download link for the bid manual. Only Registered Bidders will be updated periodically with addenda and other relevant information relevant to submitting a Bid for the Project. Neither Owner nor Administrator will be responsible for any errors made by any Bidder as a result of the Bidder having used inaccurate and/or incomplete Bidding Documents, including addenda, if any, if Bidder obtains its Bid Documents from sources other than the dedicated email address. Bidders are solely responsible for ensuring that they have received all addenda issued prior to submission of their Bid and the failure to acknowledge required addenda may result in rejection of the Bid as non-responsive. Instructions to BiddersAdditional requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 15.00% WBE Goal: 15.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sara Cernadas-Martin(Director of NY Ecological Restoration Programs)

[email protected]

(347) 221-4374

Key dates

Opened
7/21/2026
Questions due
8/10/2026
Pre-bid meeting
8/5/2026Mandatory
Site visit
8/5/2026Mandatory
Closes
8/24/2026
Duration
18 months

Last updated

Details

Type
Request for Proposal
Industry
Environmental Services
NAICS
541620
Solicitation №
TBD

Budget estimate

$1,000,000 – $5,000,000

The budget for this project is estimated to be in the range of $1 million to $5 million, considering the scope of work involves restoration of wetlands, construction of a Live Timber Crib Wall and Revetment Toe, and installation of nearshore oyster castle wave attenuators. The project's complexity, location, and the fact that it is a government-funded project also support this estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Washakie County Conservation District·Wyoming

Top match · 67%

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

U.S. Natural Resources Conservation Service·United States of America

66% match

Easement Restoration and Stewardship

Closes 11/19/2026Opened 9/25/2026

U.S. DOC NOAA - ERA Production·United States of America

66% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

State of Missouri Office of Administration·Missouri

66% match

Big Lake State Park - Reclaim & Stabilize Marsh Phase 1 Campgrounds

Closes 12/1/2026Opened 11/9/2026

California Grants·California

65% match

Habitat Enhancement and Restoration

Rolling / TBD closeOpened 6/17/2025

California Grants·California

64% match

Inland Wetlands Conservation

Rolling / TBD closeOpened 6/18/2025

U.S. Department Of Defense·Illinois

64% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025

Laramie Rivers Conservation District·Wyoming

64% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

East Bay Municipal Utility District·California

64% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

Dept of Natural Resources·Wisconsin

63% match

Long Term Management of ILF Wetland Mitigation Sites

Closes 12/8/2026Opened 10/16/2026

Illinois Department of Natural Resources·Illinois

63% match

PR - Wildlife Restoration (FY25)

Rolling / TBD closeOpened 1/1/2024

U.S. Department Of Defense·South Dakota

63% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

Illinois Department of Natural Resources·Illinois

63% match

PR - Wildlife Restoration (FY27)

Rolling / TBD closeOpened 1/1/2026

California Grants·California

62% match

Proposition 1 Delta Water Quality and Ecosystem Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

U.S. DOC NOAA - ERA Production·United States of America

62% match

DARRP Restoration Implementation Grants (2026)

Closes 11/18/2026Opened 9/1/2026

Illinois Department of Natural Resources·Illinois

62% match

PR - Wildlife Restoration (FY24)

Rolling / TBD closeOpened 3/8/2023

Santa Clara Valley Water District·California

62% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

California Grants·California

62% match

Proposition 1 Watershed Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

U.S. Fish and Wildlife Service·United States of America

62% match

F26AS00062: Great Lakes Fish and Wildlife Restoration Act FY 2026

Rolling / TBD closeOpened 6/1/2026

Commonwealth of Kentucky·Kentucky

62% match

RFB-105-27 Big Bone Lake Dam Decommissioning

Closes 12/2/2026Opened 10/27/2026

California Grants·California

61% match

Riparian Habitat Conservation

Rolling / TBD closeOpened 6/6/2025

U.S. Department Of Defense·Nebraska

61% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 9/22/2027Opened 9/22/2026

Virginia Polytechnic Institute and State University·Virginia

61% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

California Grants·California

61% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

Georgia City of Roswell·Georgia

61% match

Big Creek Demolition project

Closes 11/23/2026Opened 10/27/2026