Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Civil Engineering
  5. ›City of Belle, City of Belle Rock Island Trail

Missouri Department of Transportation·Missouri

City of Belle, City of Belle Rock Island Trail

Closes 1/14/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Belle, Missouri, is seeking bids for the construction of the Rock Island Trail, which includes an 8,750 linear feet trail with a 12-foot-wide granular surface, non-woven geotextile separation/drainage fabric, and other features. The project also involves the installation of a Trailhead Information Board Structure, water bottle filler, and site restoration. The successful bidder will be required to pay not less than the prevailing rate of wages as found by the Department of Labor and Industrial Relations of the State of Missouri or determined by the courts of appeal, or not less than the federal rates (Davis-Bacon Act) specified. The project is an equal opportunity bidding event, and MBE/WBE firms are encouraged to respond. • The project involves construction of an 8,750 linear feet trail with a 12-foot-wide granular surface • The project includes installation of a Trailhead Information Board Structure, water bottle filler, and site restoration • The successful bidder will be required to pay not less than the prevailing rate of wages as found by the Department of Labor and Industrial Relations of the State of Missouri or determined by the courts of appeal, or not less than the federal rates (Davis-Bacon Act) specified • The project is an equal opportunity bidding event, and MBE/WBE firms are encouraged to respond • Federal funds will be used to assist in the development of the project, and all relevant federal, state, and local requirements apply

Attached files

Contact

[email protected]

(952) 233-1632

Key dates

Opened
12/23/2025
Pre-bid meeting
12/30/2025
Closes
1/14/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work, which includes the construction of an 8,750 linear feet trail with a 12-foot-wide granular surface, non-woven geotextile separation/drainage fabric, and other features. The cost of materials, labor, and equipment for such a project could range from $500,000 to $2,000,000, depending on the complexity of the project, the location, and the contractor’s expertise. Factors that may influence the likely payment range include the cost of materials, labor costs, equipment rental costs, and the contractor’s overhead and profit margins.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Cobb County·Georgia

Top match · 61%

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Cincinnati·Ohio

59% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Minnesota Department of Administration·Minnesota

59% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

City of Gainesville - Procurement Division·Florida

59% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

City of Cincinnati·Ohio

59% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Green Cove Springs·Florida

59% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

City of Goshen, Indiana·Indiana

59% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

City of Middletown·Connecticut

58% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

Illinois Natural Resources·Illinois

58% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

County of Fairfax·Virginia

58% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

Georgia Cobb County Department of Transportation·Georgia

58% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

City of Hampton·Virginia

58% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

U.S. Department Of Defense·Missouri

58% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

Ontonagon Valley Sportsmen's Club·Michigan

58% match

Ontonagon Valley Sportsmen's Club South Branch Ontonagon River Canoe Landing

Closes 12/18/2026Opened 9/26/2026

City of Lincoln·California

57% match

Trail Maintenance RFP

Closes 11/13/2026Opened 10/21/2026

Alaska Department of Transportation & Public Facilities·Alaska

57% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

Camden County·New Jersey

57% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Charlotte·North Carolina

57% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

City of Bentonville·Arkansas

57% match

Invitation For Bid (IFB)-26-75 – Arkansas Missouri Trail

Closes 11/3/2026Opened 10/11/2026

Open Space Institute·South Carolina

57% match

The Meadows Boardwalk Trail Project

Closes 11/16/2026Opened 10/27/2026

City of Elk Grove·California

57% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

Haines Borough·Alaska

57% match

Snow Removal for Historic Dalton Trail (Eagle Vista Subdivision)

Rolling / TBD closeOpened 9/24/2026

City of Maryville·Missouri

57% match

South Main Trail Connection Project - Maryville, MO

Closes 11/10/2026Opened 10/8/2026

City of Charlotte·North Carolina

57% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Charlotte·North Carolina

57% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027