Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›Willis Wood Trail Development

Massachusetts Town of Lynnfield·Massachusetts

Willis Wood Trail Development

Closes 10/15/2026$500k – $1.5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Lynnfield seeks a qualified contractor to design‑build a natural‑surface trail system (approximately 1.5‑3 mi) within Willis Woods, including bog‑bridges, a 14‑step staircase, two permanent bridges, and full as‑built documentation. The work must meet USFS Class 3 trail standards, involve supervision of volunteer labor, and comply with extensive prevailing‑wage, bonding, and insurance requirements. • Construct three primary trails (East Line, Riverside, South Side) totaling ~1.46 mi, plus optional extensions up to ~1.5 mi if funded. • Build bog‑bridges using felled trees or planks, a 14‑step staircase, and two engineered bridges (≈10 ft & 22 ft spans). • Provide detailed as‑built drawings, cost summaries, and maintain compliance with Massachusetts prevailing‑wage schedules, safety certifications, and bond/insurance mandates.

Attached files

Contact

Tommy Frohlichstein(Assistant Conservation Planner)

[email protected]

Key dates

Opened
10/1/2026
Closes
10/15/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237990
Solicitation №
BD-26-1290-LFDPW-DPW-133810

Budget estimate

$500,000 – $1,500,000

Based on comparable municipal trail projects, a 1.5‑3 mi natural‑surface trail with multiple bridges and a staircase typically costs between $0.5 M and $1.5 M, depending on site conditions, material choices, and labor rates (including prevailing‑wage premiums). This estimate assumes standard earthwork, timber bridge fabrication, and a modest design‑build markup.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Open Space Institute·South Carolina

Top match · 64%

Meadows Boardwalk Trail Number

Closes 11/16/2026Opened 10/29/2026

Virginia Department of Transportation·Virginia

64% match

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

Howard County, Office of Procurement·Maryland

64% match

Patuxent Branch Trail Improvements

Closes 12/23/2026Opened 10/23/2026

City of Gainesville - Procurement Division·Florida

64% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Open Space Institute·South Carolina

63% match

The Meadows Boardwalk Trail Project

Closes 11/16/2026Opened 10/27/2026

Cobb County·Georgia

63% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Open Space Institute·South Carolina

63% match

The Meadows Boardwalk Trail Project

Closes 11/13/2026Opened 10/23/2026

City of Goshen, Indiana·Indiana

63% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

Connecticut Town of Simsbury·Connecticut

63% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Minnesota Department of Administration·Minnesota

63% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Harris County·Georgia

63% match

Man-O-War Trail, Phase VI

Closes 1/18/2027Opened 12/5/2022

Delaware County·Pennsylvania

63% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

City of Haines City·Florida

63% match

Boomerang Park Nature Trail Project - Design Services

Closes 11/10/2026Opened 10/9/2026

Maryland Department of Natural Resources·Maryland

62% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

Georgia Cobb County Department of Transportation·Georgia

62% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Ontonagon Valley Sportsmen's Club·Michigan

62% match

Ontonagon Valley Sportsmen's Club South Branch Ontonagon River Canoe Landing

Closes 12/18/2026Opened 9/26/2026

City of Lake Wales·Florida

62% match

RFP 27-02 GC Services for Kiwanis Park Loop Trail

Closes 11/4/2026Opened 9/30/2026

Illinois Natural Resources·Illinois

62% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

City of Green Cove Springs·Florida

62% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

City of Middletown·Connecticut

62% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

South Carolina Forestry Comm·South Carolina

62% match

WAMBAW TRAIL MAINTENANCE AND GROOMING

Closes 11/5/2026Opened 10/14/2026

City of Etowah·Arkansas

62% match

PARK IMPROVEMENTS TO INCLUDE EXTENSION OF WALKING TRAIL, REPAIR OF EXISTING WALKING TRAIL AND OTHER IMPROVEMENTS

Closes 11/10/2026Opened 10/18/2026

Maryland City of Westminster·Maryland

62% match

Wakefield Valley Park

Closes 11/19/2026Opened 10/17/2026

Pennsylvania Department of Conservation and Natural Resources Bureau of Forestry, Silviculture Section·Pennsylvania

61% match

Moshannon State Forest Timber Stumpage Sale – Silent Whistle

Closes 12/9/2026Opened 9/28/2026

Oregon Marion County·Oregon

61% match

ITB - Construction of the Timber Trail Guardrail

Closes 11/3/2026Opened 10/12/2026