Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Civil Engineering
  5. ›751/23128.TAP; Net River Dam Modernization and Restoration

Michigan Department of Natural Resources·Michigan

751/23128.TAP; Net River Dam Modernization and Restoration

Closes 3/4/2026$1M – $5MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Michigan Department of Natural Resources is seeking a contractor to modernize and restore the Net River Dam in Baraga County, Michigan. The project involves the removal and replacement of the existing corrugated metal pipe (CMP) culvert, the reconstruction of the embankment, and the installation of a new precast outlet structure. The contractor will also be responsible for the removal and disposal of existing materials, including concrete, steel, and geotextile fabric. The project requires the contractor to submit a demolition plan and to coordinate with the owner and engineer to ensure that the work is done in accordance with the specifications and regulations. The key aspects of the project include: • Removal and replacement of the existing CMP culvert • Reconstruction of the embankment • Installation of a new precast outlet structure • Removal and disposal of existing materials • Submission of a demolition plan • Coordination with the owner and engineer The project is expected to be completed in phases, with the first phase involving the construction of cofferdams, excavation of the embankment, and removal of the existing CMP culvert and outlet structure. The second phase will involve the placement of salvaged riprap, supplementation of riprap downstream of the outlet structure, and reconstruction of the embankment. Some of the key features of the project include: • The use of timber matting for access and laydown within wetlands • The requirement for a site-specific Soil Erosion and Sedimentation Control (SESC) plan • The need for coordination with the owner and engineer to ensure compliance with regulations and specifications • The importance of protecting the existing boat launch during construction The project requires a high level of expertise and experience in construction, engineering, and environmental management. The contractor must be able to demonstrate a strong understanding of the project requirements and regulations, and must be able to coordinate effectively with the owner and engineer to ensure the successful completion of the project. • Key materials and equipment required for the project include: • Corrugated metal pipe (CMP) • Precast concrete outlet structure • Geotextile fabric • Timber matting • Soil erosion and sedimentation control measures • Construction equipment, such as excavators, cranes, and pumps The project is subject to various regulations and specifications, including the Michigan Department of Environment, Great Lakes, and Energy (EGLE) regulations and the American Society of Civil Engineers (ASCE) standards. The contractor must be able to demonstrate compliance with these regulations and specifications, and must be able to coordinate effectively with the owner and engineer to ensure that the project is completed in accordance with the requirements.

Attached files

Contact

Kristi Zakrzewski(Buyer)

[email protected]

(517) 243-5669

Key dates

Opened
2/18/2026
Closes
3/4/2026

Last updated

Details

Type
Request for Quotation
Industry
Civil Engineering
NAICS
236220
Solicitation №
RFQ-171-260000000140-2

Budget estimate

$1,000,000 – $5,000,000

The budget for this project is estimated to be in the range of $1 million to $5 million, based on the scope of work and the materials required. The project involves the removal and replacement of the existing CMP culvert, the reconstruction of the embankment, and the installation of a new precast outlet structure, which are significant construction activities that require specialized equipment and labor. The cost of materials, such as the precast concrete outlet structure and geotextile fabric, will also contribute to the overall budget. Additionally, the project requires the contractor to submit a demolition plan and to coordinate with the owner and engineer, which may add to the overall cost. However, the exact budget will depend on the specifics of the project, including the size and complexity of the work, the location, and the contractor's experience and expertise.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

New York City Department of Environmental Protection·New York

Top match · 71%

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

New York City Department of Environmental Protection·New York

71% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Upper Occoquan Service Authority·Virginia

69% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

68% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

Massachusetts Department of Transportation·Massachusetts

68% match

612193 ANDOVER FAP No. HIP(NGB)-0934(003) Bridge Preservation, A-09-022, I-93 over Merrimack River

Closes 12/1/2026Opened 8/24/2026

Riverton City·Utah

68% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

Gwinnett County Government·Georgia

68% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Borough of Eatontown·New Jersey

68% match

Notice to Bidders - Revised - Wampum Lake Dam Rehabilitation - Bid Opening November 13, 2026

Closes 11/13/2026Opened 10/5/2026

New York City Department of Environmental Protection·New York

68% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

U.S. Department Of Defense·Kentucky

68% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Massachusetts Town of Bolton·Massachusetts

68% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

Clean River Partners·Minnesota

68% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

NYS Niagara County·New York

68% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

Washakie County Conservation District·Wyoming

68% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

The City of Columbus·Ohio

67% match

RFQ033860 - Olentangy River Rd/Snouffer Rd Home Sewage Treatment System

Closes 11/13/2026Opened 10/13/2026

Minnesota Department of Administration·Minnesota

67% match

Douglas Lodge Area Water & Sewer Replacement

Closes 11/19/2026Opened 10/15/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Minnesota Department of Transportation·Minnesota

67% match

Bridge No. 4190

Closes 11/18/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026