The City of Fresno is seeking a qualified contractor to design‑build the “McKinley & Blythe Complete Streets” project, a federal‑aid street reconstruction and improvement effort. The work includes demolition of existing pavement and curb‑gutter, installation of new curb, gutter, sidewalks, ADA‑compliant ramps, storm‑drain infrastructure, new traffic signal installation, signal modification, street lighting, paving, and associated landscaping and utility adjustments. The contract is a single‑award, “complete work” bid with a construction allocation of roughly $3.63 M and a performance period of 120 working days from notice to proceed. Bids must be submitted electronically or in paper form by April 21, 2026, with a mandatory 10 % bid deposit and required 100 % performance and payment bonds.
• Demolition of existing asphalt, curb, gutter, and underground storm‑drain components.
• Construction of new curb, gutter, sidewalks, ADA ramps, storm‑drain system, traffic signal at McKinley & Blythe, and modification of signal at McKinley & Weldon.
• Installation of street lighting, pavement resurfacing, landscaping, utility adjustments, and related site work, all in compliance with FHWA, Caltrans, and City of Fresno specifications.