Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Montana
  4. ›Environmental Services
  5. ›Soil Excavation at MDT Swan Lake Facility

Montana Department of Transportation·Montana

Soil Excavation at MDT Swan Lake Facility

Closes 4/10/2026$150k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Montana Department of Transportation (MDT) is seeking a qualified contractor to perform soil excavation, one‑time landfarm disposal, and associated groundwater monitoring at the former MDT Swan Lake Facility. The work includes removing contaminated soils, transporting them to an approved landfarm, reinstalling a monitoring well, conducting post‑excavation groundwater sampling, and delivering a comprehensive cleanup report. Bidders must be registered with the State’s Labor & Industry division, provide bid security if the total bid is $150,000 or more, and certify nondiscrimination under state statutes. • Excavation of approximately 750 LCY of contaminated soil and 250 LCY of clean overburden (volumes subject to field verification). • Transport and placement of contaminated soil at the MDT Ferndale one‑time landfarm, followed by back‑filling, compaction, and addition of oxygen‑releasing compound. • Re‑installation of monitoring well MW‑8, groundwater sampling within 30 days of excavation, and analytical reporting to DEQ‑approved labs. • Submission of a Draft Cleanup Report (Jan 2027) and Final Report (Nov 2027), with required data‑validation documentation.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Krystelle Baranyai(Contact)

[email protected]

Key dates

Opened
3/13/2026
Closes
4/10/2026

Last updated

Details

Type
Invitation for Bid
Industry
Environmental Services
NAICS
562910
Solicitation №
MDT-316398-KB

Budget estimate

$150,000 – $500,000

No contract value is disclosed. Based on the volume of soil (≈1,000 LCY total) plus transport, landfarm placement, back‑fill, well reinstall, sampling, and extensive reporting, a typical market rate for similar remediation projects in Montana ranges from $150 k to $500 k. The lower bound assumes minimal site‑specific challenges and use of standard equipment; the upper bound accounts for higher labor rates, possible hazardous‑waste handling, and the extensive reporting/quality‑control requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Tarrant Regional Water District·Texas

Top match · 64%

Construction Management Services for Marty Leonard Wetlands and Mary's Creek Indirect Water Reclamation

Closes 11/4/2026Opened 9/29/2026

St. Tammany Parish Government·Louisiana

64% match

Lake D' Este Dr Drainage

Closes 11/10/2026Opened 10/26/2026

West Virginia Department of Environmental Protection·West Virginia

64% match

AML - Shinnston (Sheppard) Mine Drainage

Closes 11/20/2026Opened 10/14/2026

Marlboro County·South Carolina

63% match

CONCRETE PAD AND SOIL IMPROVEMENT PROJECT

Closes 12/1/2026Opened 10/23/2026

U.S. Department Of Agriculture·Utah

63% match

Yellow Lake Disaster Relief Project – Watershed / Uinta-Wasatch-Cache NF

Closes 11/9/2026Opened 10/30/2026

City of Murfreesboro·Tennessee

63% match

Auxiliary Lake Intake Sediment and Debris Removal

Closes 11/13/2026Opened 10/20/2026

Town of Springfield·Vermont

63% match

Springfield Water Service Hydroexcavation

Closes 11/6/2026Opened 10/12/2026

Michigan Department of Environment, Great Lakes, and Energy·Michigan

62% match

761/19006.SAR; NuWay Cleaners Site - Remedial Excavation

Closes 11/18/2026Opened 10/6/2026

Virginia Polytechnic Institute and State University·Virginia

62% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

62% match

Request for Information – Sinkhole Remediation

Rolling / TBD closeOpened 5/13/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

62% match

Abandoned Mine Reclamation Project – Rocky Glen Pond, Moosic Borough, Lackawanna County

Closes 12/3/2026Opened 10/30/2026

Michigan Troy School District Board of Education·Michigan

62% match

RFP 2627-04 Larson MS 2027 Athletic Track Renovation

Closes 11/11/2026Opened 10/26/2026

City of Prior Lake·Minnesota

62% match

2026-2027 Pond Maintenance Project

Closes 11/19/2026Opened 10/30/2026

Iowa Department of Agriculture and Land Stewardship·Iowa

62% match

26-16 Buc880725C (Buchanan)

Closes 11/12/2026Opened 10/17/2026

West Virginia Department of Environmental Protection – Office of Abandoned Mine Lands & Reclamation·West Virginia

62% match

AML - Summerlee AMD Treatment

Closes 11/12/2026Opened 10/6/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

62% match

DOT&PF Notice of Geotechnical Investigation: Ketchikan Tongass Avenue & Water Street Viaducts

Rolling / TBD closeOpened 8/17/2026

Montana Department of Transportation·Montana

62% match

Demolition and Removal State-Owned Property - 1016 Kern Street, Missoula

Closes 11/13/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

62% match

Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)

Closes 12/3/2026Opened 10/27/2026

Michigan Department of Environment, Great Lakes, and Energy·Michigan

62% match

761/19006.SAR; NuWay Cleaners Site - Remedial Excavation

Closes 11/18/2026Opened 10/29/2026

West Virginia Department of Environmental Protection·West Virginia

62% match

AML- Bridgeport (Tomes) Landslide

Closes 11/4/2026Opened 10/19/2026

U.S. Department Of The Interior·Nevada

62% match

Y--BASSIE SPRING IMPROVEMENT PROJECT

Closes 11/9/2026Opened 9/25/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

62% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

NYS Sleepy Hollow, Village of·New York

62% match

64-68 BEEKMAN AVENUE SITE CLEANUP PROJECT

Closes 11/23/2026Opened 10/23/2026

Louisiana St. Tammany Parish Government·Louisiana

62% match

Lake D' Este Dr Drainage

Closes 11/10/2026Opened 10/26/2026

West Virginia Department of Environmental Protection·West Virginia

61% match

AML- Simpson Creek Highwall, Tipple and Portals Phase II

Closes 11/23/2026Opened 10/26/2026