The Santa Clara Valley Water District (Valley Water) is seeking a qualified contractor to replace three existing carbon‑steel, motor‑operated slide gates in the Madrone Channel near Morgan Hill, CA, with new stainless‑steel gates of approximately 12 ft W × 4 ft H × 8 in D. The work includes removal of the existing gates, fabrication and installation of the new gates, provision of all labor, equipment, materials, safety programs, and coordination of a three‑week water‑shutdown window provided by Valley Water. Installations are to be completed in two scheduled windows: Year 1 (April 1 – August 31 2026) for Gates 3 and 5, and Year 2 (April 1 – August 31 2027) for Gate 9. The contractor must comply with extensive safety, environmental, bonding, and insurance requirements, and must attend a mandatory pre‑bid Zoom meeting and on‑site walk‑through.
• Remove and dispose of three carbon‑steel slide gates and associated mounting hardware.
• Fabricate and install three stainless‑steel slide gates (≈ 12 × 4 × 8 in) with field‑verified dimensions and modified mounting mechanisms.
• Provide all labor, materials, equipment, PPE, portable sanitation, safety/health programs, and manage a three‑week water‑shutdown coordinated by Valley Water.
• Complete work within the specified Apr‑Aug windows for each gate, adhering to strict schedule, liquidated‑damage, and badge‑control penalties.