Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›PROJECT L 617 TRANSMISSION LINE REBUILD

Connecticut City of Norwich·Connecticut

PROJECT L 617 TRANSMISSION LINE REBUILD

Closes 9/24/2026$1M – $5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Burns & McDonnell, on behalf of Norwich Public Utilities, is seeking qualified subcontractors to perform clearing, access, foundation, and structure installation for the L‑617 C403 transmission line rebuild. The scope includes site preparation, erection of new support structures, and installation of high‑voltage conductors along an existing right‑of‑way. Interested firms must first execute a nondisclosure agreement (NDA) before receiving the full RFP package. This is a non‑line‑item bid (single‑package solicitation) and is open to all vendors. • Subcontractor work for high‑voltage transmission line reconstruction (clearing, grading, foundation, structure installation) • Must obtain and sign NDA prior to RFP access • Project located in and around Norwich, Connecticut • Procurement managed through State of Connecticut DAS portal (bid number 27‑24) • No line‑item pricing; bidders submit a comprehensive proposal covering all listed activities

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Karl Klein

[email protected]

(860) 823-3706

Key dates

Opened
9/10/2026
Closes
9/24/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237130
Solicitation №
27-24

Budget estimate

$1,000,000 – $5,000,000

The solicitation does not disclose a budget. A typical transmission‑line reconstruction subcontract of this scale (several miles of 138 kV line, including clearing, foundation, and structure installation) usually ranges from $1 million to $5 million depending on length, terrain, and material costs. Therefore, a reasonable estimate for the award value is between $1 M and $5 M. Factors influencing the final amount include the exact mileage of line, site conditions, required structural specifications, and prevailing labor/material rates in Connecticut.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Springfield·Illinois

Top match · 72%

Transmission Line Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

Georgia City of Elberton·Georgia

69% match

Electric Capital Improvement Project South Oliver Line Rehabilitation Project

Closes 12/2/2026Opened 10/23/2026

City of Lake City and City of Bellechester·Minnesota

67% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

Bristol Virginia Utilities Authority·Virginia

66% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

Louisiana Office of State Procurement·Louisiana

66% match

Transmission Line Installation - LETA

Closes 11/5/2026Opened 10/15/2026

Utility Board of the City of Key West·Florida

65% match

Specifications for Emergency Repair of 69kV Transmission Line 1

Closes 11/27/2026Opened 10/29/2026

City of Glendale·California

64% match

TRANSFORMER & LTC REPAIR

Closes 11/5/2026Opened 9/22/2026

U.S. Department Of Defense·New York

64% match

106 CE ELECTRICAL LOOP REPAIR

Closes 11/6/2026Opened 10/29/2026

Jea·Florida

64% match

1412223281 (ITN) Enterprise Asset Management Software Solution

Rolling / TBD closeOpened 10/1/2026

City of Bellevue·Washington

64% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Louisiana Office of State Procurement·Louisiana

64% match

Transmission Line Material - LETA

Closes 11/5/2026Opened 10/15/2026

Catawba Regional Council of Governments·South Carolina

64% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Oak Manor Municipal Utility District·Texas

64% match

Waterline Rehabilitation along Oak Trail, Oak Manor Drive, & Shady Oak Court

Closes 11/5/2026Opened 10/23/2026

City of Conway·South Carolina

63% match

Highway 905 Water Line Upgrade

Closes 12/3/2026Opened 10/30/2026

Jacksonville Port Authority·Florida

63% match

Rebuild Engine and Reconditioning of the generator on crane #10487

Rolling / TBD closeOpened 3/4/2026

City of Palo Alto·California

63% match

Refurbishment of Existing On Load Tap Changer at Adobe Creek Substation - AC21

Closes 11/3/2026Opened 10/15/2026

City of Charlotte·North Carolina

63% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

City of Fargo·North Dakota

63% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Charlotte·North Carolina

63% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Rockford·Illinois

63% match

LEAD SERVICE LINE REPLACEMENT PHASE 11H

Closes 11/2/2026Opened 9/14/2026

City of Rockford·Illinois

63% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

Massachusetts Town of Westborough·Massachusetts

63% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Rockford·Illinois

63% match

LEAD SERVICE LINE REPLACEMENT PHASE 11G

Closes 11/2/2026Opened 9/14/2026

City of Grand Forks, North Dakota·North Dakota

63% match

2027 Lead Service Line Replacement

Closes 11/19/2026Opened 10/29/2026

City of Orangeburg·South Carolina

63% match

Utility Transmission & Distribution System Construction & Maintenance

Closes 12/2/2026Opened 10/27/2026