Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Civil Engineering
  5. ›Central Street Crossing of Short Creek Design

Mohave County·Arizona

Central Street Crossing of Short Creek Design

Closes 5/6/2026$350k – $450kRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Mohave is seeking a qualified firm to provide professional civil engineering services for the design of a drainage crossing in Colorado City, Arizona. The project involves the upgrade and replacement of the existing Central Street crossing of Short Creek Wash, which overflows during large storm events, causing road closures and restricting access for residents. The selected consultant will advance the existing 30% design concept through final design, incorporating all necessary engineering, permitting, hydraulic analysis, and construction-ready documentation required for FEMA review and approval. The proposed design includes the installation of two 48-foot Conspan culverts, which will raise the Central Street crossing by approximately eight feet to safely convey the 100-year storm event beneath the roadway. • The project requires the preparation of a 100% design package, including project survey, temporary construction easement and drainage easement preparation, geotechnical investigation, utility relocation planning, and final construction document preparation. • The consultant must ensure that the final design complies with all applicable federal, state, and local laws, codes, and standards, including MAG standards. • The consultant will be responsible for obtaining a Nationwide 404 Permit and associated bio and cultural clearances, as well as a Conditional Letter of Map Revision. • The consultant must also provide post-design services, including as-built plan preparation, SWPPP closeout, and Letter of Map Revision.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Shelli Whaley(Procurement Officer)

[email protected]

(928) 753-0752 Ext: 3

Key dates

Opened
4/8/2026
Questions due
4/21/2026
Pre-bid meeting
4/15/2026
Closes
5/6/2026
Duration
7 months

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541310
Solicitation №
2026-042-RFQ

Budget estimate

$350,000 – $450,000

The design project budget is $400,000, which is a combination of HMGP and local funds. This amount will likely be the budget for the selected consultant. However, the actual budget may vary depending on the negotiated contract rates and the scope of work. Factors that may influence the budget include the complexity of the design, the need for additional permits or approvals, and the consultant's level of experience and expertise.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Florida Keys Aqueduct Authority·Florida

Top match · 60%

Snake Creek Subaqueous Crossing

Closes 11/23/2026Opened 9/30/2026

City of Indianapolis·Indiana

59% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026

Missouri Department of Transportation·Missouri

58% match

SE District, City of Poplar Bluff, PB Pine Street Crossing project

Closes 11/3/2026Opened 10/6/2026

City of Sacramento·California

57% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

Missouri Department of Transportation·Missouri

57% match

KC District, City of Smithville, construction of a single lane roundabout at the intersection of Bridge Street

Closes 11/3/2026Opened 9/30/2026

Division of Highways·North Carolina

57% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

City of San Antonio·Texas

56% match

23-03935 George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

Texas City of San Antonio·Texas

56% match

George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

Florida Keys Aqueduct Authority·Florida

56% match

Snake Creek Subaqueous Crossing

Closes 11/23/2026Opened 9/30/2026

City of Harrisonburg·Virginia

56% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

City of Lebanon·Indiana

56% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

City of Charlotte·North Carolina

55% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Benewah County·Idaho

55% match

Charlie Creek Road over Santa Creek Bridge Replacement 30090-117

Closes 11/19/2026Opened 10/30/2026

Oregon Clackamas County·Oregon

55% match

RFP 2026-80 Sandy River Force Main River Crossing Project â?? Progressive Design-Build

Closes 12/3/2026Opened 10/29/2026

City of Indianapolis·Indiana

55% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026

City of Newton·Kansas

55% match

Newton Plum Street Bridge Rehabilitation Design

Closes 11/3/2026Opened 10/14/2026

City of Indianapolis·Indiana

55% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026

Town of Pulaski·Virginia

55% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

Charleston County·South Carolina

55% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

Massachusetts City of Brockton·Massachusetts

55% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

City of Hampton·Virginia

55% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

California Department of Transportation·California

55% match

Temp bridge, deck portion Repl, hang conduit, & polyester Conc overlay

Closes 11/4/2026Opened 9/28/2026

Delaware Valley Regional Planning Commission·Pennsylvania

54% match

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026

City of Madison·Wisconsin

54% match

Old Middleton Road Underpass of WSOR Railroad / Troy Drive Underpass / University Crossing Underpass of WSOR railroad

Closes 12/17/2026Opened 9/18/2026

Cobb County, GA·Georgia

54% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026