Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Westward Beach Road Embankment Repairs Project

City of Malibu·California

Westward Beach Road Embankment Repairs Project

Closes 4/2/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Malibu is seeking bids for the Westward Beach Road Embankment Repairs Project. The project involves addressing drainage and erosion along a section of Westward Beach Road, including rock revetment, asphalt berm, pavement repair, storm drain, environmental mitigation, and all other appurtenant work. The project requires a Class "A" or "C-12" State of California licensed contractor. The bid shall be submitted and the work shall be performed in strict conformance with the project specifications. • The project includes rock revetment, asphalt berm, pavement repair, storm drain, and environmental mitigation. • The project requires a Class "A" or "C-12" State of California licensed contractor. • The bid shall be submitted and the work shall be performed in strict conformance with the project specifications. • The City reserves the right to retain all bids for a period of 120 days after the bid opening date for examination and comparison. • The City reserves the right to determine and waive nonsubstantial irregularities in any bid, and to reject any or all bids.

Attached files

Contact

Julie Santia(Contact Person)

[email protected]

(310) 456-2489 ext. 238

Key dates

Opened
3/9/2026
Closes
4/2/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
2100

Budget estimate

$500,000 – $2,000,000

The budget for this project is difficult to estimate without more specific information about the scope of work and the materials required. However, based on the fact that the project involves rock revetment, asphalt berm, pavement repair, storm drain, and environmental mitigation, it is likely that the budget will be in the range of $500,000 to $2 million. This estimate is based on the assumption that the project will require significant materials and labor costs, but the exact amount will depend on the specific requirements of the project. Factors that may influence the likely payment range include the complexity of the project, the location, and the materials required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Volusia·Florida

Top match · 72%

River Beach Drive Vehicular Beach Access Ramp Reconstruction Project

Closes 11/5/2026Opened 9/29/2026

County of Volusia·Florida

71% match

Seaview Vehicular Beach Access Ramp Reconstruction Project

Closes 11/5/2026Opened 9/29/2026

City of Fernandina Beach, FL·Florida

70% match

Beach Harmonization - Seaside Park

Closes 11/30/2026Opened 10/22/2026

City of Ormond Beach - Purchasing Office·Florida

69% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

City of Vernon·California

68% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Quonset Development Corporation·Rhode Island

68% match

Davisville Road Relocation (West)

Closes 11/12/2026Opened 11/12/2026

U.S. Department Of Defense·Georgia

68% match

Tybee Island Shoreline Protection Project

Closes 11/6/2026Opened 10/22/2026

County of Collier, FL·Florida

68% match

Beach Maintenance and Related Activities

Closes 11/12/2026Opened 10/9/2026

County of Santa Cruz·California

68% match

SOQUEL SAN JOSE RD PM 5.55 STORM DAMAGE REPAIR PROJECT, FEDERAL PROJECT No. ER-15J2 (004)

Closes 11/5/2026Opened 10/8/2026

U.S. Department Of Defense·Hawaii

68% match

Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair, Haleiwa, Oahu, Hawaii

Closes 11/10/2026Opened 6/23/2026

Massachusetts Department of Transportation·Massachusetts

68% match

616396 DISTRICT 1 Scheduled and Emergency Drainage, Slope, and Roadway Repairs/Improvements at Var

Closes 11/17/2026Opened 10/26/2026

Massachusetts Port Authority - Capital Programs·Massachusetts

68% match

East Boston Parks Repairs Term Contract (MP2700‑C1)

Closes 11/4/2026Opened 10/14/2026

City of Marco Island·Florida

67% match

ITB 2026-013 Winterberry & Maple Beach Access Beautification

Closes 11/19/2026Opened 10/18/2026

City of Norfolk·Virginia

67% match

Virginia Beach Blvd Over NS RR Bridge Rehabilitation

Closes 11/16/2026Opened 10/2/2026

Town of Camp Verde·Arizona

67% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Connecticut Town of Voluntown·Connecticut

67% match

Shetucket Tpke & Beach Pond Sidewalk Construction

Closes 11/13/2026Opened 10/8/2026

Escambia County·Florida

67% match

Dune Matrix Enhancement- Pensacola Beach - National Coastal Resilience Fund NFWF

Closes 11/3/2026Opened 9/21/2026

County of Santa Cruz·California

67% match

HIGHLAND WAY PM 5.60 AND 5.80 STORM DAMAGE REPAIR PROJECTS, FEDERAL PROJECT No. ER-15J2 (005 & 006)

Closes 11/5/2026Opened 10/8/2026

Massachusetts Town of Bolton·Massachusetts

67% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

Maryland Department of Transportation·Maryland

67% match

MD 249 (Piney Point Road) from Thomas Road to Stark Drive -Drainage Improvements -Design-Build

Closes 11/17/2026Opened 9/29/2026

The Village of Royal Palm Beach·Florida

67% match

Heron Parkway Drainage Improvements PW1903

Closes 11/10/2026Opened 10/15/2026

County of Santa Cruz·California

67% match

Eureka Canyon Road PM 8.11 and 8.39 Storm Damage Repair Projects

Closes 11/5/2026Opened 10/8/2026

Illinois Tollway·Illinois

67% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

City of Charlotte·North Carolina

67% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

U.S. Department Of Defense·Virginia

67% match

Repair Taxiway Pavements (Phase 3 and 4) Naval Air Station Oceana, Virginia

Closes 11/5/2026Opened 10/21/2026