Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Construction
  5. ›Prospect Park Pump Replacement

City of Wheat Ridge·Colorado

Prospect Park Pump Replacement

Closes 6/4/2026$50k – $200kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Wheat Ridge is seeking a qualified contractor to provide and install a new pump system at Prospect Park. The existing pump system is outdated and requires replacement to ensure efficient and reliable operation. The new pump system will support the park's irrigation needs and maintain the water features. This project includes the removal of the existing pump, installation of the new pump, and all associated electrical and plumbing work. The contractor shall provide a pump system that meets or exceeds the specified requirements, including a lineshaft pump, flow rate, head, motor, and control panel. The contractor will also be responsible for site assessment, removal of the existing pump, installation of the new pump, electrical work, control panel installation, testing and commissioning, training, and documentation. • The project must be completed within 60 days from the date of the contract award. • The contractor shall adhere to the specified delivery requirements, including project timeline, delivery schedule, site access, safety, and inspections. • The contractor shall also meet the additional requirements, including licensing and insurance, references, and warranty. • The evaluation process will be based on the evaluation criteria, including firm capabilities and references, scope of submission, effective approach and timeline, and price and/or total cost of ownership.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Joe Buesser(Procurement Team)

[email protected]

(303) 205-7559

Key dates

Opened
4/27/2026
Questions due
5/19/2026
Pre-bid meeting
5/6/2026
Closes
6/4/2026
Duration
60 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
26-24

Budget estimate

$50,000 – $200,000

The budget for this project can be estimated based on the scope of work and the requirements specified. The project involves the replacement of a pump system, including removal, installation, and associated electrical and plumbing work. The cost of such a project can vary depending on the size of the pump system, the materials used, and the labor costs. However, based on industry standards, a rough estimate for a project of this nature could be between $50,000 to $200,000. This estimate takes into account the cost of the pump system, electrical and plumbing materials, labor costs, and other expenses.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Camden·South Carolina

Top match · 64%

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026

City of Branson·Missouri

64% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

City of Fort Myers·Florida

62% match

Sole Source - Xylem Water Solutions - Flygt Lift Station Pumps

Closes 11/4/2026Opened 10/14/2026

New York City Department of Environmental Protection·New York

62% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

New York City Department of Environmental Protection·New York

62% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

North Carolina City of Raleigh·North Carolina

62% match

EM Johnson WTP 605 High Service Pump Replacement

Closes 12/8/2026Opened 10/30/2026

City of Key West·Florida

61% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

City of Hollywood·Florida

61% match

SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Closes 11/25/2026Opened 10/20/2026

Miami‑Dade County Water & Sewer Department·Florida

61% match

Pump Station 0812 Relocation and Upgrade

Closes 12/1/2026Opened 10/16/2026

U.S. Department Of Defense·Maryland

61% match

NSWCCD York Chill Pump Replacement

Closes 11/16/2026Opened 10/26/2026

City of San Diego·California

61% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Hilliard, Ohio·Ohio

61% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

City of Chicago·Illinois

60% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

Department of Water·Hawaii

60% match

IFB Job No. 27-03, Koloa Well F Pump Replacement, Kauai, Hawaii

Closes 11/12/2026Opened 10/19/2026

City of Worcester·Massachusetts

60% match

Water Booster Pump Skid Replacement / DPW

Closes 11/25/2026Opened 10/20/2026

City of Tampa, Florida·Florida

60% match

26-C-00018 Gunlock Pump Station Force Main Replacement

Closes 11/17/2026Opened 10/16/2026

U.S. Department Of Veterans Affairs·New York

60% match

Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT

Closes 11/11/2026Opened 10/29/2026

Connecticut City of New Britain·Connecticut

60% match

27-009 Willow Brook Park Pool Filter Replacement

Closes 11/24/2026Opened 10/30/2026

City of Redding·California

60% match

Overhaul of Two (2) Boiler Feedwater Pumps, Motors & Valves

Closes 12/4/2026Opened 10/26/2026

City of Yuba City·California

60% match

City Gauche Aquatic Park (GAP) Pool Heater Replacement Project

Closes 11/10/2026Opened 10/28/2026

City of Philadelphia·Pennsylvania

60% match

PW Bid 2478 - HVAC Construction for the Replacement of 42nd St Pumping Station Fed Funded

Closes 11/17/2026Opened 10/9/2026

Gwinnett County Government·Georgia

60% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

People with Developmental Disabilities, NYS Office for·New York

60% match

SOIRA 7266 SR 3(Cranberry Lake) Replacement of Well Pump Project

Closes 11/4/2026Opened 10/7/2026

City of Tampa, Florida·Florida

59% match

RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design

Closes 12/3/2026Opened 10/30/2026

Metropolitan Council·Minnesota

59% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026