The USFWS is seeking a qualified contractor to design and construct a new 2,362‑sq‑ft administration building at the Edenton National Fish Hatchery in North Carolina. The scope includes demolition of the existing structure (if required), site preparation, full steel‑frame construction, interior finishes, mechanical/electrical/plumbing installation, specialty items (kitchen appliances, fixtures), and commissioning. The contract is firm‑fixed‑price with a performance period from 10 Oct 2026 to 30 Sep 2027. The contractor must hold an Unlimited Commercial license in NC, provide a qualified superintendent/quality‑control manager (can be combined), and manage all required testing, special inspections, and safety compliance. The award will be based on price and past performance, with CPARS/PPQ accepted in lieu of a questionnaire.
• New admin building (~2,362 sf) with lobby, offices, crew room, mechanical/electrical rooms, restrooms, copy/print area.
• Light‑gauge steel structural system (no wood‑frame substitution).
• Required on‑site staff: superintendent, quality‑control manager, safety & health officer (can be one person).
• Contractor responsible for all testing, inspections, and any utility impact fees.
• Firm‑fixed‑price contract; overhead, profit, and bond rates lock‑in for change orders.
• Period of performance: 10/01/2026 – 09/30/2027 (12 months).
• Must comply with Davis‑Bacon, Buy‑American, and all federal, state, and local building codes.