Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›Airport Hangar Floor Resurfacing

Beaufort County, SC·South Carolina

Airport Hangar Floor Resurfacing

Closes 7/8/2026$150k – $300kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Beaufort County Capital Projects is soliciting proposals from qualified contractors for the resurfacing of approximately 7,500 square feet of aircraft hangar and shop flooring. The project consists of mechanical surface preparation and installing a high-performance, multi-layer resinous flooring system designed to withstand aircraft operations, heavy loads, and exposure to aviation-related chemicals. The finished floor will provide enhanced slip resistance tailored to aircraft movement and maintenance work areas, ensuring safety and long-term durability. • The project requires a high-performance, multi-layer resinous flooring system • The system must withstand aircraft operations, heavy loads, and exposure to aviation-related chemicals • The flooring system must provide enhanced slip resistance • The project includes mechanical surface preparation, moisture testing and mitigation, and installation of a 100% solids epoxy flooring system • The contractor must have experience installing resinous flooring systems in aircraft hangars, aviation facilities, or heavy industrial environments • The contractor must provide a minimum five-year warranty covering the installed flooring system

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Robert Gecy(Procurement Services Director)

[email protected]

(843) 255-2709

Key dates

Opened
5/27/2026
Questions due
7/1/2026
Pre-bid meeting
6/17/2026
Closes
7/8/2026
Duration
48 to 72 hours

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238330
Solicitation №
070326

Budget estimate

$150,000 – $300,000

Based on the scope of work, which includes resurfacing approximately 7,500 square feet of aircraft hangar and shop flooring, the estimated budget for this project could be around $150,000 to $300,000. This estimate takes into account the cost of materials, labor, and equipment required for the project. However, the actual budget may vary depending on the contractor's bid and the county's budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Texarkana Regional Airport·Arkansas

Top match · 74%

Texarkana Regional Airport – Restore and Reseal Exterior Wood Surfaces

Rolling / TBD closeOpened 9/20/2026

Port of Portland·Oregon

72% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

Raleigh Durham Airport Authority·North Carolina

71% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

City of Melbourne Airport Authority·Florida

71% match

Carpet Replacement

Closes 12/2/2026Opened 9/29/2026

Port of Portland·Oregon

70% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Franklin County Board of County Commissioners·Florida

69% match

ITB- AIRPORT WEST HANGER DEVELOPMENT

Closes 12/14/2026Opened 10/28/2026

Hillsborough County Aviation Authority·Florida

68% match

GENERAL AVIATION APRON REHABILITATION (TPA)

Closes 11/16/2026Opened 9/29/2026

City of Charlotte·North Carolina

68% match

Terminal Roof and AHU Replacements

Closes 1/1/2027Opened 8/12/2026

City of Charlotte·North Carolina

68% match

FBO Apron Expansion & Rehab

Rolling / TBD closeOpened 10/13/2026

Virgin Islands Port Authority·U.S. Virgin Islands

67% match

STX)-2027-01 (Parking Lot Resurfacing Project- Henry E Rohlsen Airport, ST. Thomas

Closes 12/2/2026Opened 10/22/2026

Raleigh Durham Airport Authority·North Carolina

67% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

67% match

15--FLOOR,AIRCRAFT

Closes 11/15/2026Opened 10/2/2026

Port of Portland·Oregon

67% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

Jacksonville Aviation Authority·Florida

67% match

JAA JAX Concourse B Apron Phase 2

Closes 11/17/2026Opened 10/15/2026

City of Lawrence·Kansas

67% match

Lawrence Municipal Airport Commercial Aeronautical Hangar Leasing

Closes 11/24/2026Opened 10/26/2026

Hot Springs National Park·Arkansas

67% match

Refurbishment or Replacement of Windows on Hangar A-12

Closes 11/23/2026Opened 10/26/2026

City of Charlotte·North Carolina

66% match

Baggage Handling System Control Room Relocation

Rolling / TBD closeOpened 6/2/2026

City of Mankato·Kansas

66% match

Mankato Airport (TKO) | 24434

Closes 11/19/2026Opened 10/31/2026

Delta Airport Consultants·Virginia

66% match

COMING SOON - Roanoke, VA - Roanoke-Blacksburg Reg. Airport - Rehabilitate Runway 6-24 (24072)

Rolling / TBD closeOpened 5/1/2026

State of Hawaii Department of Transportation – Airports·Hawaii

66% match

CM1530-33 Apron Reconstruction, Phase 1, Kahului airport

Closes 11/16/2026Opened 10/2/2026

University of South Carolina·South Carolina

66% match

Repair and Refinish Gym Floors

Closes 12/2/2026Opened 10/28/2026

U.S. Department Of Defense·Wisconsin

66% match

NEW - FLOORING IDIQ FY27-FY30

Closes 11/13/2026Opened 10/14/2026

City of Prescott·Arizona

66% match

PRC Airport Hangar Development Phase 1

Closes 12/10/2026Opened 10/30/2026

Pulaski County·Arkansas

66% match

Refurbishment or Replacement of Windows on Hangar A-12

Closes 11/23/2026Opened 10/26/2026

Delta Airport Consultants·Virginia

66% match

COMING SOON - Winchester, VA - Winchester Regional Airport - Northside Site Preparation (25023)

Rolling / TBD closeOpened 6/1/2026