Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›Paulsell Lateral Expansion - Phase 2

Oakdale Irrigation District·California

Paulsell Lateral Expansion - Phase 2

Closes 9/28/2026$4.5M – $6MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Oakdale Irrigation District (OID) is soliciting bids for Phase 2 of the Paulsell Lateral Expansion, a roughly 2‑mile canal improvement project in Stanislaus County, California. Work includes canal restructuring, installation of three automated check structures, replacement of three driveway crossings, one county road crossing, one railroad crossing, and installation of large‑diameter concrete pipe. The contractor must hold a valid Class “A” license, provide bid, performance, payment, and bid bonds, and comply with prevailing‑wage and storm‑water management requirements. The construction window is limited to the non‑irrigation season (approximately November 1 2026 – February 28 2027) with a substantial completion target of 13 February 2027 and final completion by 27 March 2027. The Engineer’s estimated construction cost is $5.2 million. Attendance at a mandatory pre‑bid conference and site visit on 9 September 2026 is required. Bids must be submitted electronically by 2 PM on 28 September 2026. • Scope: canal restructuring, pipe replacement, check structures, crossing replacements (road & rail) • Location: Oakdale, CA (Stanislaus County) • Contract value estimate: ~$5.2 M (Engineer’s estimate) • Required licenses: Class “A” contractor, bonding, prevailing‑wage compliance • Mandatory pre‑bid conference & site visit: 9 Sep 2026 (attendance required) • Bid deadline: 28 Sep 2026, 2 PM EDT • Construction window: Nov 2026 – Feb 2027 (non‑irrigation season) • Key contacts: Kim Tarantino (Bid Contact)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kim Tarantino(Bid Contact)

[email protected]

(209) 768-0289

Key dates

Opened
9/1/2026
Questions due
9/22/2026
Pre-bid meeting
9/9/2026Mandatory
Site visit
9/9/2026Mandatory
Closes
9/28/2026
Duration
5 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
237130
Solicitation №
2026-026

Budget estimate

$4,500,000 – $6,000,000

The Engineer’s estimate of probable construction costs is $5.2 million, indicating the contract award will be in that vicinity. Considering typical bid‑up allowances, bonding, and contingency, the final award could range from roughly $4.5 million (if the contractor offers a low‑bid) up to $6 million (if change orders or additional scope are added). Factors influencing the budget include the final unit prices for concrete pipe, labor rates under prevailing‑wage rules, and any unforeseen site conditions that trigger change orders.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Calhoun County Board of County Commissioners·Florida

Top match · 63%

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

U.S. Department Of Defense·Utah

62% match

Hill AFB Actuator Phase 2A

Closes 12/22/2026Opened 10/27/2026

City of Lowell·Massachusetts

61% match

Saint Louis Park Phase 2, addenda 3 issued

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Energy·California

61% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

Washington Metropolitan Area Transit Authority (WMATA)·District of Columbia

61% match

FRSMP277009/JLM-Lighting Phase 2

Closes 12/2/2026Opened 10/23/2026

Loudoun Water·Virginia

60% match

BRWRF Phase lll - Package ll

Closes 1/14/2027Opened 9/14/2026

NYS Erie County Department of Environment and Planning·New York

60% match

Southtowns AWTF Phase 2 Expansion - Manning Squires Hennig

Closes 11/5/2026Opened 10/13/2026

U.S. Department Of Defense·South Dakota

60% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

U.S. Department Of Defense·Nebraska

60% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 9/22/2027Opened 9/22/2026

Town of Upton·Wyoming

60% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

City of Ankeny·Iowa

60% match

Westlawn Place Area Utility Improvements - Phase 2A

Closes 11/10/2026Opened 10/21/2026

Manatee County - Purchasing Division·Florida

59% match

LIFT STATION 9-A FORCE MAIN EXTENSION

Closes 11/20/2026Opened 10/9/2026

U.S. Department Of Homeland Security·Maryland

59% match

Expansion Joints

Closes 11/6/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·South Carolina

59% match

Gravesite Expansion Florence National Cemetery 943CM3023

Closes 11/9/2026Opened 10/21/2026

City of Fayetteville·Arkansas

59% match

Construction - FYV Hangar Infrastructure Improvements (Phase 2)

Closes 11/3/2026Opened 10/11/2026

County of Okaloosa·Florida

59% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

U.S. Department Of Defense·Kentucky

59% match

Notice of Intent to Sole Source for Construction Phase Services related to the VA Louisville project

Closes 11/4/2026Opened 10/20/2026

U.S. Department Of Defense·Georgia

59% match

Synopsis: J&A: extension to SP330016C5004

Closes 3/5/2029Opened 3/16/2021

City of Duarte·California

59% match

Duarte Park Redevelopment: Phase II

Closes 11/23/2026Opened 10/28/2026

City of Tustin·California

59% match

Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)

Closes 12/10/2026Opened 10/28/2026

California Grants·California

59% match

Healthcare Expansion Loan Program II (HELP II)

Rolling / TBD closeOpened 3/4/2025

U.S. Department Of Defense·Louisiana

59% match

CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R

Closes 11/13/2026Opened 10/19/2026

Greater Orlando Aviation Authority·Florida

59% match

Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517)

Closes 11/9/2026Opened 9/28/2026

Ohio City of Westerville·Ohio

59% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

City of Mason·Ohio

59% match

Snider Road Widening Project - Phase 2

Closes 11/17/2026Opened 10/19/2026