Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Basin 15 Drainage Improvements - Phase 3 – Hiatus Road…

City of Sunrise·Florida

Basin 15 Drainage Improvements - Phase 3 – Hiatus Road Canal Culvert Reinforcement

Closes 6/25/2026$1M – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Sunrise is seeking bids for the Basin 15 Drainage Improvements - Phase 3 – Hiatus Road Canal Culvert Reinforcement project. The project involves the installation of a 54” reinforced concrete pipe (RCP) to be constructed parallel to the existing 54” RCP culvert, and rerouting existing street drainage. The work includes sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, dewatering, canal bypass pumping, installing 54” RCP, construction of two endwalls and two manhole structures, cutting into and connecting to existing street drainage pipe, demolition, restoration of pavement and curbs, pavement milling and resurfacing, restoration of pavement markings, sodding and other miscellaneous and incidental items for a complete project. • The project is located within the 496 acre CITY OF SUNRISE DRAINAGE BASIN 15. • The culvert reinforcement work is located at the Hiatus Road canal crossing between NW 53rd Street and NW 55th Street in the City of Sunrise. • The City has instituted an overall project for roadway culvert replacements or reinforcement within the Basin 15 area, which includes the current project work. • The parallel pipe and replacement pipe section are intended to upgrade the hydraulic flow capacity of the culvert crossing to that of a single 72” RCP.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Holly Raphaelson(Contract Administrator)

[email protected]

Key dates

Opened
5/22/2026
Pre-bid meeting
6/8/2026
Site visit
6/8/2026
Closes
6/25/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
BID-26-71-05-HR-0-2026/hr

Budget estimate

$1,000,000 – $1,500,000

The estimated budget for this project is $1,123,000. This amount is likely to be the total budget for the project, as it is specified as the projectEstimatedBudget in the document. The budget may be influenced by factors such as the complexity of the work, the materials and labor required, and the timeline for completion.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Honea Path·South Carolina

Top match · 74%

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

St. John the Baptist Parish Government·Louisiana

73% match

Bid 2026.23 Culverts and Drainage Improvements Project

Closes 11/19/2026Opened 10/21/2026

Massachusetts Town of Brewster·Massachusetts

73% match

Culvert & Bank Stabilization work

Closes 11/5/2026Opened 9/23/2026

City of Charlotte·North Carolina

73% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Georgia City of Covington·Georgia

73% match

2026-27 Three Ring Access Road Culvert Improvements

Closes 12/1/2026Opened 10/26/2026

City of Ladue·Missouri

72% match

2025 Culvert Repairs Project - Ladue, MO

Closes 11/5/2026Opened 10/6/2026

NYS Cambria, Town of·New York

72% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

Idaho Transportation Department·Idaho

72% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

Maryland Baltimore County Government·Maryland

72% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

City of Charlotte·North Carolina

72% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

California Department of Transportation·California

71% match

Drainage system restoration.

Closes 11/3/2026Opened 9/28/2026

City of Des Moines - Iowa·Iowa

71% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

U.S. Department Of The Interior·Utah

71% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

DeSoto Parish Police Jury·Louisiana

71% match

2026 DPPJ Road and Drainage Improvements Cotton Belt

Closes 11/10/2026Opened 10/15/2026

Kossuth County Drainage District No. 20 Main 2·Iowa

71% match

Kossuth County Drainage District No. 20 Main 2 Tile Improvement BMI Project No. 25X.138901

Closes 11/17/2026Opened 10/29/2026

The Village of Royal Palm Beach·Florida

71% match

Heron Parkway Drainage Improvements PW1903

Closes 11/10/2026Opened 10/15/2026

Virginia Department of Transportation·Virginia

71% match

B32_ 2027 CULVERT REHAB

Closes 11/18/2026Opened 10/13/2026

City of South Miami·Florida

71% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

Park County Public Works·Wyoming

71% match

Willwood Road Improvements Project- Phase 2 Culverts

Closes 11/16/2026Opened 10/16/2026

U.S. Department Of The Interior·Arizona

71% match

Y--MOD/MODE/US BYPASS CANAL REPAIRS

Closes 11/20/2026Opened 10/27/2026