Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Construction
  5. ›Flying Fortress Parkway Phase II

City of Kingman·Arizona

Flying Fortress Parkway Phase II

Closes 3/24/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Kingman is soliciting sealed bids for the construction of public roadway and drainage improvements for the Flying Fortress Parkway Phase II. The project includes the construction of pavement sections, drainage improvements, and other related work. The bid must be submitted electronically through the OpenGov procurement portal. The City reserves the right to reject any bid not in compliance with the prescribed solicitation procedures and requirements. • The project requires the construction of approximately 27,490 square yards of pavement section No. 1, Alt. 1, (10" PCCP, 4" ABC). • The project requires the construction of approximately 12,148 square yards of pavement section No. 2 (4" AC, 9" ABC) (AECOM). • The project requires the construction of approximately 14,470 square yards of pavement section No. 1 (4" AC, 9" ABC) (Dibble). • The project requires the removal of approximately 709 square yards of rip rap. • The project requires the removal and replacement of channel lining and concrete. • The project requires the installation of approximately 20,272 linear feet of safety pavement edge (MAG 201, Safety Edge). • The project requires the installation of approximately 340 linear feet of steel-reinforced gutter. • The project requires the installation of approximately 9,016 linear feet of single curb, MAG Det 222, Type A. • The project requires the installation of approximately 3,506 linear feet of concrete curb & gutter, MAG Type A, H=6". • The project requires the removal of approximately 135 linear feet of concrete curb and gutter. • The project requires the removal of approximately 542 square feet of sidewalk. • The project requires the removal of approximately 1,458 linear feet of chain link fence. • The project requires the removal of approximately 3,553 square yards of asphalt concrete pavement. • The project requires the installation of traffic control measures. • The project requires the installation of survey markers, MAG Det 120, Type B and Type A. • The project requires the installation of approximately 348 linear feet of 6' chain link fence, ADOT Std C12.20, Type 1. • The project requires the installation of hydro seeding - native seed mix on approximately 4 acres. • The project requires the installation of decomposed granite (DG) MAG 430.8 & 795.9 - 1" Mohave Gold on approximately 14,144 square yards. • The project requires the installation of granite mulch ¾” minus, 4” thick on approximately 356 square yards. • The project requires the installation of approximately 27,505 linear feet of 4" white traffic paint stripe. • The project requires the installation of approximately 2,979 linear feet of 4" yellow traffic paint stripe. • The project requires the installation of pavement marking symbols, left turn arrow, and legends. • The project requires the installation of reflectorized raised pavement markers, type C, clear, red. • The project requires the installation of perforated sign posts, 2S, 2 1/2S, and 2 1/2T. • The project requires the installation of flat sheet aluminum sign panels, high intensity grade. • The project requires the installation of regulatory, warning, or marker sign panels. • The project requires the installation of no. 7 pull box and no. 7 pull box w/ extension. • The project requires the installation of 2" PVC conduit, 3" PVC conduit, and 4" PVC conduit in trenches. • The project requires the installation of end sections, 30" CMP and 42" CMP. • The project requires the installation of 18" slotted drain, ADOT C-13.60. • The project requires the installation of concrete scupper, MAG Det 206, S/W=4', 1-4' curb opening, spillway included. • The project requires the installation of retaining wall, ADOT SD 7.01. • The project requires the installation of concrete box culverts, ADOT Std Det SD-6.05-1, SD-6.03-1, SD-6.02-1, SD-6.04-1, SD-6.06-1, and SD-6.02-1. • The project requires the installation of precast concrete box culverts, ADOT Std Det SD-6.20. • The project requires the installation of reinforced concrete inlet wingwalls, special detail, Culvert 3A, 3B, 20, 21, and 22. • The project requires the installation of reinforced concrete outlet wingwalls, ADOT Std Det SD-6.08-5, SD-6.11, Culvert 3A, 3B, 20, 21, and 22. • The project requires the installation of protective railing, detail DD. • The project requires the installation of safety rail, height = 3'-6", MAG Det 145. • The project requires the installation of channel lining, concrete, 6" thick. • The project requires the installation of 12" CMP, 16 gauge, galvanized, 30" CMP, 16 gauge, galvanized, and 42" CMP, 16 gauge, galvanized. • The project requires the installation of end sections, 30" CMP and 42" CMP. • The project requires the installation of 18" slotted drain, ADOT C-13.60.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sabrina Hilton(Project Manager)

[email protected]

(928) 565-1422

Key dates

Opened
2/26/2026
Questions due
3/16/2026
Pre-bid meeting
3/12/2026
Closes
3/24/2026
Duration
150 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
2026-IFB-003

Budget estimate

$5,000,000 – $15,000,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves the construction of approximately 27,490 square yards of pavement section, 12,148 square yards of pavement section No. 2, and 14,470 square yards of pavement section No. 1. The project also requires the installation of drainage improvements, including the construction of concrete box culverts and reinforced concrete inlet and outlet wingwalls. The cost of materials, labor, and equipment will contribute to the overall budget. Based on industry standards and the scope of work, the budget for this project could be in the range of $5 million to $15 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Okaloosa·Florida

Top match · 67%

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

City of Fayetteville·Arkansas

66% match

Construction - FYV Hangar Infrastructure Improvements (Phase 2)

Closes 11/3/2026Opened 10/11/2026

City of Fayetteville·Arkansas

65% match

Construction - FYV Hangar Infrastructure Improvements (Phase 2)

Closes 11/3/2026Opened 10/11/2026

City of Fayetteville, Arkansas·Arkansas

65% match

Bid 26-56, Construction – FYV Hangar Infrastructure Improvements Phase 2

Closes 11/3/2026Opened 10/11/2026

City of Prescott·Arizona

64% match

PRC Airport Hangar Development Phase 1

Closes 12/10/2026Opened 10/30/2026

NYS Niagara Frontier Transportation Authority·New York

63% match

NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/5/2026

Town of Medfield·Massachusetts

63% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

U.S. Department Of Defense·Ohio

63% match

RWP - Test Site 2 (TS2) Improvements & Modernization, Aerospace Vehicle Survivability Facility (AVSF)

Closes 11/16/2026Opened 10/17/2026

Town of Medfield, Massachusetts·Massachusetts

63% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

Niagara Frontier Transit Authority (NFTA)·New York

63% match

12NA2603 - NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/6/2026

NYS Niagara Frontier Transportation Authority·New York

62% match

NFIA – Runway 10-28 Rehabilitation (Designs)

Closes 11/3/2026Opened 10/2/2026

Municipality of Anchorage·Alaska

62% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

62% match

RFI Contractor F-16 Pilot Services

Closes 11/24/2026Opened 10/22/2026

City of Keene·New Hampshire

62% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Florida Keys Aqueduct Authority·Florida

62% match

MARATHON HIGHWAY CROSSING IMPROVEMENTS, PHASE I

Closes 11/19/2026Opened 10/14/2026

Delta Airport Consultants·Pennsylvania

62% match

COMING SOON - Clearfield-Lawrence Airport - Install Runway 12-30 Visual NAVAIDs-PAPI (24074)

Rolling / TBD closeOpened 10/22/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge (Greater Baton Rouge Airport District)·Louisiana

62% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/13/2026

State of Delaware DOT·Delaware

62% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

62% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/16/2026

U.S. Department Of Defense·Missouri

62% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

City of Tustin·California

62% match

Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)

Closes 12/10/2026Opened 10/28/2026

City of Northfield·Minnesota

61% match

Northfield, City of Skateboard Park Phase 2 26X.143028

Closes 11/4/2026Opened 10/16/2026

Jacksonville Aviation Authority·Florida

61% match

JAA JAX Concourse B Apron Phase 2

Closes 11/17/2026Opened 10/15/2026

City of Key West·Florida

61% match

Bayview Park Phase 2

Closes 11/9/2026Opened 9/24/2026

City of Gainesville - Procurement Division·Florida

61% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026