The project involves the full replacement of an aging water main along State Route 120 in Gwinnett County, GA. Bidders will install roughly 9,700 ft of 16‑inch ductile‑iron pipe, including associated valves, fittings, fire hydrants, and the abandonment of existing utilities. The scope also covers extensive civil works such as jack‑and‑bore operations, rock excavation, road and curb restoration, traffic control, erosion control, and tree‑replacement where private‑property trees are impacted. Pre‑qualification is mandatory, and all bids must be submitted by early September.
• Install ~9,700 ft of 16‑in. ductile‑iron water main with valves, hydrants, and fittings.
• Perform jack‑and‑bore, rock excavation, and free‑bore work; restore asphalt, curb, gutter, and landscaping.
• Provide traffic‑control plans, erosion‑control measures, tree‑replacement (private‑property hardwood), and comply with pre‑qualification and documentation requirements.