New Milford Public Schools is seeking a qualified theatrical contractor to provide a complete, turn‑key upgrade of the stage lighting and rigging system at New Milford High School. The contractor must remove existing legacy equipment and then design, supply, install, and commission modern lighting fixtures, power and data distribution, control systems, and structural rigging components. This is a single‑item contract covering design, procurement, installation, testing, and training for school staff.
• Scope includes demolition of old lighting/rigging, engineering design, equipment procurement, electrical wiring, data cabling, control console, and rigging hardware.
• Must deliver a fully operational, code‑compliant system ready for use in school productions.
• Project is turn‑key: design, supply, install, commission, and provide training/documentation.
• All work performed on‑site at New Milford High School, CT.
• Vendor must comply with state procurement rules and submit a formal proposal by the deadline (date not specified).