Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Construction
  5. ›LVMPD HQ Plumbing Drain Relining

Nevada Government·Nevada

LVMPD HQ Plumbing Drain Relining

Closes 9/10/2026$500k – $1.2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Las Vegas Metropolitan Police Department (LVMPD) is soliciting bids to relining the plumbing drain lines throughout its Headquarters facility. The scope includes trenchless pipe relining of underground PVC sewer lines, CCTV inspection of all lined pipe, relining of vent stacks and branch lines, removal and replacement of drywall where required, and full restoration of finishes (drywall repair and painting). The contractor must provide NASSCO PACP‑certified operators, supply all materials, manage site access, and submit separate cost rates for standard‑hour work and after‑hours work. The project is expected to be performed on a Monday‑to‑Friday schedule (6 am‑4 pm) with the option for overtime at additional cost. Bidders must submit required bonds, insurance, subcontractor lists, and a schedule of values. • Relining of underground PVC drainage (trenchless technology) • Full‑length CCTV inspection and documentation • Above‑ground pipe replacement, including removal/repair of drywall and painting • Gapping of fittings where lining is not feasible • Provision of all labor, materials, permits, and cleanup to the street • Mandatory inclusion of subcontractor lists (5%, 3%, 1%) and bid security (5% if >$100k) • Work to be performed during normal business hours with optional after‑hours rates

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Thomas Farrell(Purchasing Analyst)

[email protected]

(702) 828-3946

Key dates

Opened
8/12/2026
Questions due
8/31/2026
Pre-bid meeting
8/20/2026
Closes
9/10/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
608051 Addendum 1

Budget estimate

$500,000 – $1,200,000

No contract value is disclosed in the solicitation. Based on the size of a police headquarters, the need for trenchless relining of multiple drain lines, CCTV inspections, drywall removal/repair, and the requirement for bid bonds and insurance, a reasonable estimate for the total contract award is between $500,000 and $1,200,000. The lower end assumes a limited number of lines and minimal interior finish work; the higher end reflects extensive underground work, multiple vent stack relines, and full interior restoration.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Rancho Palos Verdes·California

Top match · 63%

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

U.S. Department Of Defense·Missouri

62% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Long Beach·California

62% match

As-Needed Plumbing Services

Closes 12/1/2026Opened 10/20/2026

Nevada Government·Nevada

62% match

LVMPD ARC HVAC Maintenance

Closes 11/5/2026Opened 10/12/2026

City of DeLand·Florida

61% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Norfolk·Virginia

61% match

CSRM Phase 1A Floodwall Construction - Preload & Wick Drains

Closes 11/5/2026Opened 9/29/2026

St. Tammany Parish Government·Louisiana

61% match

Wildwood Farms Subdivision Drainage

Closes 11/12/2026Opened 10/22/2026

Louisiana Sewerage and Water Board of New Orleans·Louisiana

61% match

Drainage Point Repairs

Closes 11/13/2026Opened 10/20/2026

Eastern Municipal Water District·California

61% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

City of Brandon·Mississippi

61% match

BROOKSTONE PLACE DRAINAGE IMPROVEMENTS

Closes 11/20/2026Opened 10/21/2026

McKinley County·New Mexico

61% match

ADC Shower drain backup

Rolling / TBD closeOpened 8/12/2021

St. Tammany Parish Government·Louisiana

61% match

Peg Keller Rd Drainage

Closes 11/5/2026Opened 10/14/2026

Dedham Housing Authority·Massachusetts

61% match

Main Isolation Valves, Bathroom Sinks, Faucets and Water Shutoffs

Closes 11/12/2026Opened 10/28/2026

Horry County·South Carolina

60% match

Rebid Jones Road Drainage Improvement Project

Closes 12/29/2026Opened 11/26/2025

Norton Housing Authority·Massachusetts

60% match

Tub Surround & Shower Valve Replacement REBID

Closes 11/4/2026Opened 10/7/2026

Maryland Baltimore City Department of Public Works·Maryland

60% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

Oregon Tualatin Valley Water District·Oregon

60% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

Nevada Government·Nevada

60% match

LVMPD SNCTC Audio/Visual Equipment Modernization

Closes 11/3/2026Opened 10/5/2026

Kossuth County Drainage District No. 20 Main 2·Iowa

60% match

Kossuth County Drainage District No. 20 Main 2 Tile Improvement BMI Project No. 25X.138901

Closes 11/17/2026Opened 10/29/2026

Hastings Utilities·Nebraska

60% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

City of Minneapolis·Minnesota

60% match

BID-PW-Private Water and Sewer Svc Relocation 2027

Closes 11/3/2026Opened 10/16/2026

UCLA Capital Programs·California

60% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 23 - Plumbing)

Rolling / TBD closeOpened 10/23/2026

Metropolitan Council·Minnesota

60% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

City of DeLand·Florida

60% match

2024 Downtown South Water Main Improvements-East Phase

Closes 11/17/2026Opened 10/13/2026

City of Pearland·Texas

60% match

Scarsdale Boulevard Sewer Extension

Closes 11/4/2026Opened 10/14/2026