Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Manufacturing
  5. ›Pueblo Water Works - FALK GRID COUPLING

Colorado Board of Water Works of Pueblo·Colorado

Pueblo Water Works - FALK GRID COUPLING

Closes 10/28/2025$5k – $20kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Board of Water Works of Pueblo, Colorado, is seeking bids for a new complete 1090T10 Falk Steelflex Grid coupling, including two rough stock bore hubs, two grid sections, two nitrile seals, two aluminum covers, and all included hardware. The coupling should have a torque rating of 33,000 in-lbs, a max speed of 3600RPM, and a max bore of 3.50in. The bidder should include lead time and delivery fee for the coupling. • Coupling Size: 1090 • Size: T10 Close-Coupled • Grid Coupling Type: Standard Grid Taper • Bore Type: Rough Stock • Cover Type: Horizontal Split • Cover Material: Cast Aluminum • Torque Rating: 33,000 in-lbs • Max Speed: 3600RPM • Max Bore: 3.50in • Minimum Bore: 1.062in • Coupling Overall Length: 7.88in • Hub Outside Diameter: 4.88in • Hub Length: 3.88in • Cover Overall Length: 4.81in • Cover Outside Diameter: 8.31in • Gap: 0.125in • Net Weight: 56.44lbs

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Carlotta Delgado(Procurement Specialist)

[email protected]

(719) 584-0201

Key dates

Opened
10/13/2025
Questions due
10/22/2025
Closes
10/28/2025
Duration
48 days

Last updated

Details

Type
Invitation for Bid
Industry
Manufacturing
NAICS
333612
Solicitation №
ITB-25-060 Falk Grid Coupling

Budget estimate

$5,000 – $20,000

The budget for this opportunity is likely to be around $5,000 to $20,000, considering the cost of a single Falk Steelflex Grid coupling and the fact that the bid is for a one-time delivery. The actual budget may vary depending on the bidder's price, lead time, and delivery fee. The factors that may influence the likely payment range include the cost of materials, manufacturing, and delivery, as well as the bidder's profit margin and any applicable taxes or fees.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Litchfield·Illinois

Top match · 61%

Water Distribution Improvements Phases 1 & 2 - Litchfield, IL

Closes 11/5/2026Opened 10/2/2026

New Mexico General Services Department·New Mexico

60% match

INSTALLATION AND SERVICE OF WATER SYSTEMS

Closes 11/10/2026Opened 10/1/2026

U.S. Department Of The Interior·New Mexico

60% match

Y--Turnout Buildings

Closes 11/10/2026Opened 10/13/2026

Southwest Regional Water District·Iowa

60% match

F Ave. 10" Waterline Improvements, Southwest Regional Water District - Clarinda, Iowa

Closes 11/2/2026Opened 9/22/2026

City of El Paso De Robles·California

60% match

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

Closes 11/18/2026Opened 10/29/2026

Fort Bend County Municipal Utility District No. 134A·Texas

60% match

Offsite Water Line Loop, Sanitary Sewer and Force Main to Serve Fort Bend County Municipal Utility District No. 134A

Closes 11/6/2026Opened 10/1/2026

City of Red Oak·Texas

60% match

12-Inch and 10-Inch Carson Street Water Lines

Closes 11/17/2026Opened 10/27/2026

Citrus County - Board of County Commissioners·Florida

60% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

City of Waco·Texas

60% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

Connecticut Cromwell Fire District·Connecticut

60% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

59% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of North Platte·Nebraska

59% match

Dewey Street Water

Closes 11/10/2026Opened 10/7/2026

Connecticut Cromwell Fire District·Connecticut

59% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

Washakie County Conservation District·Wyoming

59% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Kansas Department of Wildlife and Parks·Kansas

59% match

Pratt Water System Improvements

Closes 11/10/2026Opened 10/12/2026

U.S. National Energy Technology Laboratory·United States of America

59% match

Grid Supply Chain Alternatives to Lead Energy Dominance (SCALED)

Closes 2/8/2027Opened 10/30/2026

U.S. Department Of Defense·Hawaii

59% match

Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of Oahu

Closes 1/7/2027Opened 9/25/2026

U.S. Bureau of Reclamation·United States of America

59% match

Native American Affairs: Fiscal Year 2025 Colorado River Basin Tribal Drought Resiliency Program

Closes 11/20/2026Opened 6/2/2026

Montana Department of Environmental Quality·Montana

59% match

Public Water System Technical, Financial & Managerial Assistance

Closes 12/1/2026Opened 10/8/2026

County of San Luis Obispo·California

59% match

Nacimiento Water Project Unit G Repair Construction Management

Closes 11/3/2026Opened 9/29/2026

Village of Cary·Illinois

59% match

RFQ-P Well No. 4 and WTP Phase II and III Engineering Services 11.20.26

Closes 11/6/2026Opened 10/20/2026

El Paso Water·Texas

59% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

Texas Parks & Wildlife Department·Texas

59% match

P# - New Public Water System, Colorado Bend State Park, Bend County, Texas

Closes 12/2/2026Opened 10/30/2026

City of Douglas WY·Wyoming

59% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026

San Bernardino County·California

59% match

CSA 42 Wells No. 3 and 4 Replacement (Hydrogeologic/Engineering Design Services)

Closes 12/4/2026Opened 10/5/2026