Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Civil Engineering
  5. ›Belk Lane Drainage Improvements (ARPA)

Nueces County·Texas

Belk Lane Drainage Improvements (ARPA)

Closes 3/3/2026$500k – $2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Nueces County is seeking bids for the Belk Lane Drainage Improvements project, located adjacent to 2320 CR67, Robstown, TX 78380. The project involves drainage improvements, including channel excavation, concrete headwalls and wingwalls, reinforced concrete pipe (RCP), HDPE pipe, concrete box culverts, safety end treatments, driveway repair, and seeding for erosion control. The scope of work includes a base bid and two additive bids. The contractor will be responsible for completing all work called for under the contract documents on or before 154 calendar days after the date of Notice to Proceed. • The base bid consists of drainage improvements, including channel excavation, concrete headwalls and wingwalls, RCP, HDPE pipe, concrete box culverts, safety end treatments, driveway repair, and seeding for erosion control. • Additive Bid No. 1 consists of additional RCPs, ditch regrading, and safety end treatments at the proposed berm location. • Additive Bid No. 2 consists of additional ditch regrading and concrete riprap at the outfall. • The contractor shall provide all tools and equipment necessary to complete the project in its entirety. • The contractor shall take proper care to avoid unnecessary noise, clatter, or obstructions in walkways, sidewalks, and roadways.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Robinson(Purchasing Agent)

[email protected]

(361) 888-0426

Key dates

Opened
2/16/2026
Pre-bid meeting
2/26/2026
Closes
3/3/2026
Duration
154 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
3279-24

Budget estimate

$500,000 – $2,000,000

The budget amount for this project is not specified in the document. However, based on the scope of work and the fact that it is a construction project, the budget amount could be estimated to be in the range of $500,000 to $2,000,000. This estimate is based on the assumption that the project will require significant excavation, concrete, and piping work, and that the contractor will need to provide all necessary tools and equipment.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Valdosta·Georgia

Top match · 68%

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

Idaho Transportation Department·Idaho

66% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

City of Peachtree City·Georgia

66% match

Tuxedo Lane Drainage Improvements (amended)

Closes 11/17/2026Opened 10/15/2026

City of Charlotte·North Carolina

66% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

Roanoke City Government·Virginia

66% match

RFP # SOL1369, Engineering Design Services for Cove/Peters Creek Pedestrian Improvements

Closes 12/3/2026Opened 10/26/2026

DeSoto Parish Police Jury·Louisiana

65% match

2026 DPPJ Road and Drainage Improvements Cotton Belt

Closes 11/10/2026Opened 10/15/2026

Louisiana St. Tammany Parish Government·Louisiana

65% match

Peg Keller Rd Drainage

Closes 11/5/2026Opened 10/14/2026

City of Charlotte·North Carolina

65% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Austin·Texas

65% match

Pino Lane Wastewater Improvements

Rolling / TBD closeOpened 8/10/2026

Georgia City of Valdosta·Georgia

65% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

Texas Bastrop County·Texas

65% match

GLO CDBG MIT-MOD Cardinal Dr. Drainage Improvements

Closes 11/10/2026Opened 9/10/2026

Georgia City of Peachtree City·Georgia

65% match

Tuxedo Lane Drainage Improvement Project (10/19 amended)

Closes 11/17/2026Opened 10/15/2026

City of Brandon·Mississippi

65% match

BROOKSTONE PLACE DRAINAGE IMPROVEMENTS

Closes 11/20/2026Opened 10/21/2026

Town of South Hill·Virginia

65% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

St. Tammany Parish Government·Louisiana

65% match

Peg Keller Rd Drainage

Closes 11/5/2026Opened 10/14/2026

Horry County·South Carolina

65% match

Rebid Jones Road Drainage Improvement Project

Closes 12/29/2026Opened 11/26/2025

City of Easley·South Carolina

65% match

North Dale Drive Drainage System Improvements

Closes 1/28/2027Opened 10/16/2026

City of Lynchburg·Virginia

65% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

65% match

AMR, Beulah Rd Wilkins Twp. (Lucia Dr), Allegheny

Closes 11/12/2026Opened 10/16/2026

The Village of Royal Palm Beach·Florida

65% match

Heron Parkway Drainage Improvements PW1903

Closes 11/10/2026Opened 10/15/2026

Village of Glenview·Illinois

65% match

Crabtree Ln, Linneman St, Virginia Ln Roadway & Utility Improvements

Closes 11/12/2026Opened 10/29/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

64% match

Abandoned Mine Reclamation – Beulah Road (Lucia Drive)

Closes 11/12/2026Opened 10/16/2026

City of South Miami·Florida

64% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

City of Fredonia·Kansas

64% match

Distribution System Improvements - Fredonia, KS

Closes 11/12/2026Opened 10/29/2026

City of Charlotte·North Carolina

64% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027