The Georgia State Financing and Investment Commission (GSFIC) is seeking statements of qualifications from Utility Contractors and/or General Contractors (UC/GC) interested in pre-qualifying as an eligible bidder for the upcoming project known as Project No. AGRFM.24.032 (GDA-50) - Utility Upgrades & Repairs, Phase 1 at the Georgia Agriculture Terminal. The project consists of major infrastructure improvements, including stormwater, sanitary sewer, water distribution, site work, and telecommunications. The preliminary stated cost limitation or construction cost of the project is unknown, but firms must be able to bond at a minimum of $40,000,000 to pre-qualify. The project is expected to begin in April/May 2026 and must reach material completion within 12 months.
• Stormwater infrastructure improvements, including a 1.8 million cubic foot concrete underground detention vault system and new trunkline system
• Sanitary sewer system improvements, including a new trunkline system with PVC and ductile iron piping
• Water distribution system improvements, including a new loop throughout the proposed utility corridors and replacement of the existing master meter and cast iron water network
• Site work, including construction of a new secure paved truck/trailer parking area and relocation of the vehicular entrance from Frontage Road
• Telecommunications, including a telecommunications concrete duct bank with six 6” PVC conduits