Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Engineering Services
  5. ›2026 Quandary Peak Trailhead Redesign

Summit County·Colorado

2026 Quandary Peak Trailhead Redesign

Closes 7/14/2026$800k – $2.5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County and Town of Breckenridge are seeking a qualified contractor to redesign the Quandary Peak Trailhead in two phases: an initial data‑collection and site‑assessment phase followed by a full 100 % engineered design phase. The effort includes boundary and topographic surveys, geotechnical and drainage studies, utility locating, traffic analysis, and the production of progressive design packages (30 %, 60 %, 90 % and final 100 % plans) that will support expanded parking, shuttle operations, double‑vault toilet facilities, and compliance with Summit County land‑use codes. • Phase 1 (due Nov 1 2026) – surveys, preliminary geotechnical, drainage, environmental, and traffic reports. • Phase 2 (mid‑2027) – detailed engineering design, final cost estimate, revegetation plan, and construction‑ready documents. • Deliverables must meet specific code requirements for parking‑lot grading, setbacks, snow‑storage, and tree‑buffer preservation. • Contractor must provide insurance, indemnification, and a 90‑day proposal validity period.

Attached files

Contact

Allison Morton(Senior Resource Specialist)

[email protected]

(970) 668-4213

Key dates

Opened
6/11/2026
Questions due
6/26/2026
Pre-bid meeting
6/22/2026
Closes
7/14/2026
Projected award
8/3/2026
Duration
18 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330

Budget estimate

$800,000 – $2,500,000

The solicitation does not disclose a budget, but a comparable trailhead redesign involving extensive surveying, geotechnical work, and full 100 % design for a mountain‑region parking facility typically ranges between $800,000 and $2.5 million, depending on the depth of site investigations, the complexity of drainage solutions, and the level of detail required in final construction documents. The lower end reflects a streamlined scope with limited sub‑surface challenges; the higher end accounts for extensive utility coordination, snow‑maintenance design, and higher‑priced engineering labor in a remote, high‑altitude environment.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Maryland Department of Natural Resources·Maryland

Top match · 63%

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

Delaware County·Pennsylvania

63% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

Georgia Liberty County Board of Commissioners·Georgia

63% match

MAIN TRAIL ROAD IMPROVEMENTS

Closes 11/17/2026Opened 10/14/2026

City of Keene·New Hampshire

62% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Harris County·Georgia

62% match

Man-O-War Trail, Phase VI

Closes 1/18/2027Opened 12/5/2022

Virginia Department of Transportation·Virginia

62% match

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

Kenosha County·Wisconsin

62% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Maryland Howard County Government·Maryland

62% match

IFB-2027-19 PATUXENT BRANCH TRAIL IMPROVEMENTS

Closes 12/23/2026Opened 10/24/2026

Delaware Valley Regional Planning Commission·Pennsylvania

61% match

Feasibility Study for Naylor's Run and Pennsy Trails (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 11/13/2026Opened 10/5/2026

Maryland Department Of General Services·Maryland

61% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

Cobb County·Georgia

61% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Connecticut City of Middletown·Connecticut

61% match

Bid #2026-008- Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

U.S. Department Of Transportation·Washington

61% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

County of Marin·California

60% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

City of Keene·New Hampshire

60% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Green Bay·Wisconsin

60% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Georgia Cobb County Department of Transportation·Georgia

60% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Iowa City·Iowa

60% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

Georgia Cobb County Department of Transportation·Georgia

60% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

Montana Department of Natural Resources and Conservation·Montana

60% match

2026 Summit DMA Orphan Well P&A

Closes 11/24/2026Opened 10/30/2026

Mississippi Department of Finance and Administration·Mississippi

60% match

MMNS Trail Repairs (GS# 610-015)

Closes 11/17/2026Opened 10/15/2026

U.S. Department Of Agriculture·California

59% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

City of Hutchinson·Kansas

59% match

Request for Proposal Jim Martinez Trail

Closes 11/20/2026Opened 10/26/2026

Alaska Department of Transportation and Public Facilities·Alaska

59% match

RTP Grant Application - Rehabilitation of Multi-Purpose Trail in Galena

Rolling / TBD closeOpened 9/24/2026

Minnesota Department of Administration·Minnesota

59% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026