Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Engineering Services
  5. ›South Fork Water Intake Resiliency Project

North Carolina Town of Boone·North Carolina

South Fork Water Intake Resiliency Project

Closes 6/9/2026$2M – $3MRequest for Expression of Interest
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Boone is seeking a private engineering firm to provide an engineering report, environmental information document, design, and construction administration and inspection services for elevating a water intake. The selected firm will be responsible for overseeing the construction contract and ensuring that all work is performed in accordance with the contract requirements. The firm must demonstrate experience with water intake design, modification, and construction inspection services, as well as the ability to meet project milestone dates. Key considerations for evaluation include the firm's experience, knowledge, and past performance, as well as the experience of the proposed staff. • The project involves elevating the internal electrical and mechanical components of the South Fork water intake by an additional story. • The total project budget is $2,500,000. • The selected firm will report directly to the Town and will be responsible for administering the construction contract. • The firm must have the financial ability to undertake the work and assume the liability. • The proposed method of payment for this contract is lump sum.

Attached files

Contact

Joshua Eller(Deputy Public Works Director)

[email protected]

(828) 268-6250

Key dates

Opened
5/11/2026
Closes
6/9/2026
Projected award
6/15/2026
Duration
24 months

Last updated

Details

Type
Request for Expression of Interest
Industry
Engineering Services
NAICS
541330
Solicitation №
678-SFWI-060926

Budget estimate

$2,000,000 – $3,000,000

The budget for this opportunity is estimated to be around $2,500,000, which is the total project budget. This estimate is based on the information provided in the document, which states that the proposed method of payment for this contract is lump sum. The actual budget may vary depending on the specifics of the contract and the services provided. Factors that may influence the likely payment range include the complexity of the project, the experience and qualifications of the selected firm, and the scope of work required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Grants·California

Top match · 72%

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

California Grants·California

69% match

The Safe and Affordable Funding for Equity and Resilience Program (SAFER)

Rolling / TBD closeOpened 6/28/2024

California Grants·California

68% match

Prop 4 – Wildfire and Forest Resilience

Rolling / TBD closeOpened 6/8/2026

Massachusetts Executive Office of Energy and Environmental Affairs·Massachusetts

68% match

Drought Resiliency and Water Efficiency Grant Program RFR

Closes 11/12/2026Opened 10/1/2026

California Grants·California

68% match

Proposition 4 – River

Rolling / TBD closeOpened 6/11/2025

Eastern Municipal Water District·California

68% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

U.S. Bureau of Reclamation·United States of America

68% match

Native American Affairs: Fiscal Year 2025 Colorado River Basin Tribal Drought Resiliency Program

Closes 11/20/2026Opened 6/2/2026

Citrus County - Board of County Commissioners·Florida

67% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

California Grants·California

67% match

Baldwin Hills & Urban Watersheds Conservancy (BH UWC) Proposition 4: Community and Climate Resilience Grant Program

Rolling / TBD closeOpened 5/6/2026

California Grants·California

67% match

Drinking Water State Revolving Fund (DWSRF) Planning

Rolling / TBD closeOpened 8/1/2022

California Grants·California

67% match

Drinking Water State Revolving Fund (DWSRF) Construction

Rolling / TBD closeOpened 8/2/2022

Environmental Conservation, NYS Department of·New York

67% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

California Grants·California

67% match

The Water Quality, Supply, and Infrastructure Improvement Act of 2014 (Proposition 1) SMMC Grant Program

Rolling / TBD closeOpened 6/11/2025

California Grants·California

67% match

Climate Adaptation and Resiliency

Rolling / TBD closeOpened 6/18/2025

U.S. Department Of Defense·Kentucky

67% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

California Grants·California

66% match

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026

Santa Clara Valley Water District·California

66% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

U.S. Bureau of Reclamation·United States of America

66% match

WaterSMART Drought Response Program

Closes 10/2/2031Opened 3/5/2026

California Grants·California

66% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

U.S. Department Of Defense·South Dakota

66% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

U.S. DOC NOAA - ERA Production·United States of America

66% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

U.S. Bureau of Reclamation·United States of America

66% match

Title XVI Water Reclamation and Reuse Projects

Closes 8/26/2027Opened 5/14/2026